the decision pattern.TDP.

Germany machine tools market size 2025

German machine tool production fell 8% to about €13.6bn in 2025, with orders down 3% and exports down 9%, according to the VDW. Domestic consumption was €6.6bn. VDW expects a 1% recovery to €13.7bn in 2026 as orders turn up. Here are the production, order and export figures.

Medium confidenceResearched 2 November 20267 linked sources
Market size 2025
€13.6bn production
Range
€9.4bn (machines only, excluding parts, accessories and services)–€13.6bn (full VDW definition)
Forecast
€13.7bn in 2026 (VDW, +1%)
Growth
down 8% in 2025; orders up 15% in Q1 2026

Market size

German machine tool production fell 8% to about €13.6bn in 2025, according to the VDW (German Machine Tool Builders' Association); later VDW releases round the figure to €13.8bn. That covers parts, accessories, installation and repair. On the narrowest definition, machines alone, VDW gives €9.4bn, just above the pandemic years and below the €10bn mark.

Domestic consumption was €6,555m in 2025, down 6%, and exports €8,592m, down 9%. Gardner's World Machine Tool Survey, in dollars, ranks Germany third in consumption at $5.13bn in 2025, behind China ($26.4bn) and the United States ($11.4bn).

Measure (€ m)20242025Change
Production, full definition14,79513,645-8%
Order intake, total11,38011,045-3%
Exports9,4128,592-9%
Imports3,1602,992-5%
Domestic consumption6,9986,555-6%
Capacity utilisation81.7%75.6%-6.1 points

All rows are VDW statistics published in February 2026; Q4 2025 production is estimated.

Market structure

  • Exports carry the industry. Foreign orders rose 3% in 2025 while domestic orders fell 16%. Europe takes about half of exports. Automotive customers were 23% of 2025 sales, mechanical engineering 27% and aerospace 11%.
  • China has overtaken Germany as the top exporter. Germany holds 17% of world exports, second behind China, whose exports hit a record €8.6bn in 2025. China makes about 37% of world production against Germany's 12%.
  • Output is far below the peak. Production is about 20% below 2018 in nominal terms and 35% lower after inflation. Capacity utilisation averaged 75.6% in 2025.
  • Jobs are going. The workforce in firms with more than 50 employees fell to 62,711 in December 2025 and about 60,000 by June 2026.
  • Orders have turned. After falling 3% in 2025, order intake rose 15% in Q1 2026 and 12% in Q2 2026 (first half +14%). VDW cautions that the base is weak; first-half 2026 production was still down 7% at about €5.9bn.

How this estimate was made

  1. The headline is VDW's 2025 production figure from its January 2026 press conference (about €13.6bn, down 8%), confirmed by the February 2026 statistics (€13,645m). Mid-2026 releases say about €13.8bn, so it may be revised up slightly.
  2. The range reflects VDW's definitions: €9.4bn covers machines without parts, accessories and services; €13.6bn covers the full sector.
  3. Exports also differ by scope: €8,592m in the statistics versus about €7bn (down 10%) in the narrower trade series.
  4. Gardner's dollar figures are from the 58th World Machine Tool Survey summary (September 2026); we have not converted them to euros.
  5. The 2026 forecast of €13.7bn (+1%) is VDW's from January 2026. With first-half production down 7% it looks optimistic, but we found no revised forecast.

Questions

How big is the German machine tool industry?

Production was about €13.6bn in 2025, down 8%, according to the VDW, or €9.4bn for machines alone. Exports were €8.6bn and domestic consumption €6.6bn.

Is Germany still the world's largest machine tool exporter?

No. VDW reports that China overtook Germany in 2025 with record exports of €8.6bn. Germany holds about 17% of world exports and 12% of production, against China's 37%.

Is the German machine tool market recovering?

Orders rose 15% in Q1 2026 and 12% in Q2 2026. VDW forecast production of €13.7bn in 2026, up 1%, but first-half 2026 output was still down 7% at about €5.9bn.

Sources

  1. VDW annual press conference 2026: press release, VDW (Verein Deutscher Werkzeugmaschinenfabriken), 19 January 2026.
  2. German machine tool industry: key figures, Q4 2025, VDW, 25 February 2026.
  3. Order intake Q4 2025: press release, VDW, 16 March 2026.
  4. Order intake Q1 2026: press release (German), VDW, 23 June 2026.
  5. German machine tool industry stabilises as China widens its global lead, ETMM (VDW data), 20 March 2026.
  6. Werkzeugmaschinenbau: Aufträge steigen um 12 Prozent, Produktion (VDW data), 11 September 2026.
  7. 58th Annual World Machine Tool Survey report and data now available, MoldMaking Technology (Gardner Intelligence), 9 September 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.