Global modular construction market size 2025

The global modular construction market was worth about $110bn in 2025, but published estimates run from $95bn to $159bn because no official body counts it. North America's permanent modular segment was $24.5bn, 5.2% of its addressable market. The figures, the gaps and the forecasts.

Indicative estimateResearched 2 November 20268 linked sources
Market size 2025
about $110bn
Range
$95bn–$159bn
Forecast
$143bn–$204bn by 2030
Growth
4.2%–7.5% a year (2025–2030), depending on publisher

Market size

No statistics office or industry body measures modular construction worldwide, so the only global figures come from paid-report publishers, and they disagree. Three of the five estimates we read cluster near about $110bn for 2025: MarketsandMarkets ($109.6bn), ResearchAndMarkets' Global Market Forecast report ($110.1bn estimated for 2025, from $102.5bn in 2024) and Grand View Research ($114.8bn). IMARC is lower at $95.1bn, and a second ResearchAndMarkets title, the Strategic Industry Report, is far higher at $159.3bn for 2024. We headline the cluster and show the full range of $95bn to $159bn.

The firmest number comes from the Modular Building Institute (MBI), the North American trade body. Its 2026 industry reports put permanent, volumetric modular construction at $24.5bn in North America in 2025, 5.2% of the construction segments it addresses, with 84% of spending in the United States and 16% in Canada. The US permanent modular market alone was $20.5bn.

Estimate2025 sizeForecastGrowthPublisher
Global modular construction$109.6bn$142.9bn by 20305.4% a yearMarketsandMarkets
Global modular construction$110.1bn (est.)$158.0bn by 20307.46% a yearResearchAndMarkets (Global Market Forecast)
Global modular construction$114.8bn$198.1bn by 20336.9% a yearGrand View Research
Global modular construction$95.1bn$146.2bn by 20344.75% a yearIMARC
Global modular and prefabricated$159.3bn (2024)$203.8bn by 20304.2% a yearResearchAndMarkets (Strategic Industry Report)
North America, permanent modular$24.5bn$28bn by 20306.5% a yearModular Building Institute

Market structure

  • Permanent modular dominates. MarketsandMarkets puts the permanent segment at $85.5bn in 2025, about 78% of its global total (our calculation); Grand View gives permanent a 65.4% share. The rest is relocatable buildings such as site offices and temporary classrooms, which ResearchAndMarkets expects to grow only 2.8% a year.
  • Regions differ by publisher. MarketsandMarkets sizes Asia Pacific at $40.6bn, Europe at $33.7bn and North America at $30.7bn for 2025. Grand View instead gives Europe the largest share (38.3%) and North America 21.4%. IMARC names North America the largest region. These conflicts are one reason confidence is low.
  • Penetration is still low outside the Nordics and Japan. MBI measures modular at 5.2% of its addressable North American segments and about 5.5% of Canadian construction. McKinsey's 2019 study found around 85% of new homes in Sweden use some form of industrialised construction and that modular projects finish 20% to 50% faster than conventional builds.
  • Who buys in North America. MBI reports that 70% of US modular construction is in multifamily housing, commercial and education; in Canada, multifamily is nearly half of the market.

How this estimate was made

  1. We collected five global estimates with 2024 or 2025 base years and read each publisher's page. None discloses its method in enough detail to prefer one, so the headline is the central cluster (about $110bn) rather than any single report.
  2. The range is the lowest and highest 2025-era estimates: IMARC's $95.1bn and ResearchAndMarkets' $159.3bn (a 2024 figure that includes prefabricated as well as modular building). The gap of 67% is why confidence is low under our rules.
  3. The forecast range ($143bn to $204bn by 2030) uses the three reports that forecast to 2030: MarketsandMarkets and the two ResearchAndMarkets titles. Grand View and IMARC forecast to 2033 and 2034 and are shown in the table only.
  4. MBI's North American figures are included as the only trade-body measurement; they cover permanent volumetric modular only and are not comparable with the global totals.
  5. Missing: any official or filing-grade global figure, consistent regional splits, and a current measurement of modular's share of construction in Europe or Asia. McKinsey's $130bn potential for Europe and the US by 2030 is a 2019 scenario, not a forecast, and we do not use it in the range.

Questions

How big is the modular construction market?

About $110bn worldwide in 2025, based on a cluster of estimates from MarketsandMarkets, ResearchAndMarkets and Grand View Research. Published figures range from $95.1bn (IMARC) to $159.3bn (ResearchAndMarkets, 2024, including prefabricated construction).

How big is modular construction in North America?

The Modular Building Institute puts permanent volumetric modular construction at $24.5bn in 2025, 5.2% of the construction segments it serves, and expects $28bn by 2030. The United States accounts for 84% of that, or $20.5bn.

How fast is modular construction growing?

Published forecasts range from 4.2% to 7.5% a year to 2030. MBI expects 6.5% a year for North American permanent modular, and MarketsandMarkets 5.4% a year globally to $142.9bn in 2030.

What share of buildings are modular?

About 5% in North America by MBI's measure, and about 5% of new homes in Australia according to McKinsey. Sweden is the outlier, with around 85% of new homes using some form of industrialised construction.

Sources

  1. Industry analysis: permanent modular construction and relocatable buildings reports, Modular Building Institute, updated 29 October 2026.
  2. Permanent modular construction market reaches $24.5 billion in North America, Modular Building Institute, 2026.
  3. Modular Construction Market – Global Forecast to 2030, MarketsandMarkets, January 2026.
  4. Modular Construction Global Market Forecast Report 2025–2030, ResearchAndMarkets via GlobeNewswire, 16 September 2025.
  5. Modular Prefabricated Construction Strategic Industry Report 2025, ResearchAndMarkets via Business Wire, 19 September 2025.
  6. Modular Construction Market Size, Share & Trends Analysis Report, 2026–2033, Grand View Research, June 2025, updated October 2026.
  7. Modular Construction Market Size, Share and Forecast 2026–2034, IMARC Group, 1 May 2026.
  8. Modular construction: from projects to products, McKinsey & Company, June 2019.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.