the decision pattern.TDP.

Global offshore wind market size 2025

Global offshore wind capacity reached 92.5 GW at the end of 2025 after 9.3 GW was added in the year, 6.6 GW of it in China. GWEC expects about 327 GW more by 2035, roughly $980bn of capital spending, but auction volumes fell to 11.4 GW in 2025.

Medium confidenceResearched 2 November 20267 linked sources
Market size 2025
92.5 GW installed; 9.3 GW added in 2025
Range
9.3 GW added in 2025 (GWEC); 2 GW of it in Europe (WindEurope)
Forecast
about 420 GW installed by 2035 (GWEC)
Growth
9.3 GW added in 2025, up 16% on 2024; about 10% a year average over the past decade

Market size

The Global Wind Energy Council (GWEC) is the standard reference for this market. Its Global Offshore Wind Report 2026 puts cumulative installed capacity at 92.5 GW at the end of 2025, or 7.1% of all wind capacity, after 9.3 GW was grid-connected during the year. That was the third-highest annual total on record and 16% more than the 8 GW added in 2024, which had itself been 26% below 2023.

The market is concentrated. China commissioned 6.6 GW in 2025, over 70% of the world total for the eighth year running, and Europe close to 2 GW across three markets led by the UK, Germany and France. Five markets (China, the UK, Germany, the Netherlands and Taiwan) hold 90.3% of everything installed. WindEurope's own count for Europe, 2 GW connected in 2025 and 39 GW cumulative, matches GWEC's.

MeasureValuePeriodSource
Cumulative installed capacity92.5 GWend-2025GWEC
Cumulative installed capacity83.2 GWend-2024GWEC
Annual additions9.3 GW2025GWEC
Annual additions8 GW2024GWEC
China additions6.6 GW2025GWEC
Europe additions / cumulative2 GW / 39 GW2025WindEurope
Under constructionmore than 50 GWmid-2026GWEC
New capacity awarded in auctions11.4 GW2025GWEC
Average turbine size10.3 MW2025GWEC

What is driving it, and what is holding it back

  • China sets the pace. It has led new installations for eight years, holds about half of cumulative capacity and has a 100 GW target for 2030.
  • A large construction pipeline. More than 50 GW is under construction, up from a record 48 GW a year earlier, and GWEC expects annual installations to double in 2026 and to triple by 2030. Turbines passed 10 MW on average for the first time in 2025.
  • Auctions have stalled. New capacity awarded fell from a record 56 GW in 2024 to 11.4 GW in 2025, and about 25 GW of consented projects outside China are waiting for final investment decisions. The UK's latest round, at 8.4 GW, was the exception.
  • Forecasters have cut their numbers. GWEC's 2025 short-term outlook was 24% below its previous one, and the IEA's Renewables 2025 report lowered its offshore wind outlook by about a quarter, citing policy changes in major markets, supply-chain constraints and higher costs.
  • Investment. WindEurope counted €45bn of investment in new European wind farms (onshore and offshore) in 2025. GWEC estimates offshore wind capital spending at about $3bn per GW, implying more than $980bn over the 327 GW it expects by 2035.
  • Developers are consolidating. Ørsted, the largest pure-play developer, reports 11 GW of installed offshore capacity and 7.2 GW under construction, and operating profit of DKK 25.1bn for 2025.

How this estimate was made

  1. The headline capacity figures are GWEC's, taken from its 2026 report summary and from trade-press coverage of the launch, and cross-checked against the 2025 report (83.2 GW at end-2024, 8 GW added).
  2. WindEurope provides an independent check for Europe. Its 2 GW for 2025 and 39 GW cumulative agree with GWEC's "close to 2 GW", so the two bodies are consistent, although only GWEC publishes a global total.
  3. The forecast is GWEC's: about 327 GW of new capacity between 2026 and 2035, for roughly 420 GW installed, with annual additions above 50 GW by 2035. GWEC's 2025 edition had expected 441 GW by end-2034, so the outlook has been trimmed.
  4. The $980bn investment figure is GWEC's own multiplication of 327 GW by about $3bn per GW; it is a scenario, not a measured market value. We do not publish a dollar market size because no fetched source gives annual offshore wind revenue.
  5. Missing: a regional split of 2025 additions beyond China and Europe, and an audited figure for global offshore investment in 2025.

Questions

How much offshore wind capacity is installed worldwide?

92.5 GW at the end of 2025, according to GWEC's Global Offshore Wind Report 2026, up from 83.2 GW a year earlier. Offshore wind is 7.1% of global wind capacity.

How much offshore wind was built in 2025?

9.3 GW was grid-connected in 2025, 16% more than in 2024 and the third-highest year on record. China accounted for 6.6 GW and Europe for about 2 GW.

Which countries lead in offshore wind?

China, the UK, Germany, the Netherlands and Taiwan hold 90.3% of installed capacity between them. China alone has about half and has added the most capacity for eight consecutive years.

How big will offshore wind be by 2035?

GWEC expects about 327 GW of new capacity between 2026 and 2035, taking the total to roughly 420 GW, with more than 50 GW a year being installed by 2035. The IEA and GWEC have both cut their near-term forecasts because of policy changes, costs and weak auctions.

Sources

  1. Global Offshore Wind Report 2026, Global Wind Energy Council, 2026.
  2. GWEC unveils offshore wind plan as global capacity hits 92.5 GW, Modern Power Systems, 9 June 2026.
  3. Offshore Wind Investments to Top $980 bn as Global Capacity Set to Surge to 420 GW by 2035, GreentechLead, 9 June 2026.
  4. Offshore wind installed capacity reaches 83 GW as new report finds 2024 a record year for construction and auctions, Global Wind Energy Council, June 2025.
  5. Wind energy in Europe: 2025 Statistics and the outlook for 2026-2030, WindEurope, 26 February 2026.
  6. IEA cuts offshore wind outlook as costs and policy shifts bite, gCaptain, 8 October 2025.
  7. Ørsted to present its annual report for 2025 on February 6, Ørsted, 30 January 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.