the decision pattern.TDP.

India packaged drinking water market size 2025

India's packaged drinking water market was worth about ₹70,000 crore ($8.3bn) in 2025 on the middle of three paid estimates that range from $3.7bn to $10.7bn. Bisleri, the largest brand, had revenue of ₹2,690 crore in FY24, and over 6,200 bottlers hold BIS licences.

Indicative estimateResearched 2 November 20265 linked sources
Market size 2025
about ₹70,000 crore ($8.3bn)
Range
₹32,000 crore–₹91,000 crore ($3.7bn–$10.7bn)
Forecast
$15.0bn by 2031 (Mordor Intelligence); $29.7bn by 2034 (IMARC)
Growth
10.4%–13.8% a year (2026–2032), depending on publisher

Market size

No official body measures India's packaged water market, so the only whole-market figures come from paid research publishers, and they disagree widely. For 2025, MarkNtel Advisors puts the India bottled water market at $3.73bn, Mordor Intelligence at $8.28bn and IMARC at $10.71bn. We headline the middle estimate, about ₹70,000 crore ($8.3bn) in 2025, and show the full range of ₹32,000 crore to ₹91,000 crore. Rupee figures are our conversion at ₹85 to the dollar.

The spread is almost three to one. The publishers do not say how they treat the large unbranded and bulk-jar segment, which is where most of the 6,200-plus BIS-licensed bottlers operate, and that is the likeliest cause of the gap.

MeasureFigurePeriod and source
Market size, low estimate$3.73bn (about ₹32,000 crore)2025, MarkNtel Advisors (April 2026)
Market size, middle estimate$8.28bn (about ₹70,000 crore)2025, Mordor Intelligence (January 2026)
Market size, high estimate$10.71bn (about ₹91,000 crore)2025, IMARC (2026)
Bisleri revenue from operations₹2,689.6 croreFY24, Storyboard18
Bisleri net profit₹316.9 crore, up 82.6%FY24, Storyboard18
BIS licences for packaged drinking water (IS 14543)over 6,200September 2022, BIS
BIS licences for natural mineral water (IS 13428)over 30September 2022, BIS

Market structure

  • A fragmented, licensed industry. Packaged drinking water can only be sold under the BIS Standard Mark. BIS had granted more than 6,200 licences against IS 14543 and more than 30 against IS 13428 (natural mineral water) by September 2022.
  • One national leader. Bisleri's FY24 total income was ₹2,814 crore, up 18.3% from ₹2,378 crore, with revenue from operations of ₹2,689.6 crore. It spent over ₹100 crore on advertising, up 60% from ₹63.2 crore. Even so, Bisleri's revenue equals only about 4% of the middle market estimate (our calculation), which shows how much of the market is unbranded.
  • Other brands. The publishers name Coca-Cola (Kinley), PepsiCo (Aquafina), Parle Agro (Bailley), Tata Consumer (Himalayan), IRCTC (Rail Neer), DS Group and Manikchand as the main competitors.
  • Product mix. Mordor estimates still water at 94.2% of 2025 value, PET bottles at 92.1%, the mass segment at 85.1% and off-trade at 68.0%. North India is the largest region at 32.3%, and West India is projected to grow fastest at 12.3% a year.

How this estimate was made

  1. We found no government, industry-body or stock-exchange measure of the whole market. Three paid publishers give 2025 figures, so we use all three and headline the middle one (Mordor, $8.28bn) rather than the average, so that the headline matches a published number.
  2. The range is the lowest and highest of the three estimates. Because they differ by almost 3x and none explains its treatment of unbranded water, confidence is low.
  3. Rupee values are our conversion at ₹85 per dollar and are rounded. Bisleri's share of the market (about 4%) is ₹2,690 crore divided by ₹70,000 crore.
  4. Bisleri figures are FY24 (year to March 2024) and come from a trade-press report of its filings; we found no FY25 figures from a source we could fetch.
  5. The BIS licence counts are from a BIS blog post written in November 2022 with data to September 2022. More recent counts were not available on a page we could read, so the figure is likely understated for 2025.

Questions

How big is the packaged drinking water market in India?

Estimates for 2025 range from $3.73bn (MarkNtel) to $10.71bn (IMARC), with Mordor Intelligence at $8.28bn, or about ₹70,000 crore. There is no official measurement.

What is Bisleri's revenue?

Bisleri International reported revenue from operations of ₹2,689.6 crore and total income of ₹2,814 crore in FY24, up 18.3%, with net profit of ₹316.9 crore.

How many packaged water companies are there in India?

BIS had granted more than 6,200 licences for packaged drinking water (IS 14543) and more than 30 for natural mineral water (IS 13428) by September 2022. Every bottler must hold one to sell legally.

How fast is the market growing?

Publishers project 10.4% a year (Mordor, to 2031), 12.0% (IMARC, to 2034) and 13.8% (MarkNtel, to 2032). All three are forecasts, not measured growth.

Sources

  1. India Bottled Water Market Size and Share, Mordor Intelligence, updated 21 January 2026.
  2. India Bottled Water Market Research Report: Growth, Driver and Forecast (2026-2032), MarkNtel Advisors, April 2026.
  3. India Bottled Water Market Size, Share, Trends and Forecast, 2026-2034, IMARC Group, 2026.
  4. Bisleri spends ₹100 crore on ads in FY24, reports 83% profit surge, Storyboard18, undated (FY24 results, published about January 2025).
  5. Compulsory BIS certification of packaged drinking water (IS 14543:2016) and packaged natural mineral water (IS 13428:2005), Bureau of Indian Standards, 8 November 2022.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.