Market size
The European Coatings Journal, the sector's trade publication, put the European paints and coatings market at €40.6bn in a March 2025 analysis, with decorative coatings the largest segment at €21.8bn. It expects value to grow 3.4% a year and volume 1.5% a year to 2028. No base year is stated, so we treat it as a 2024/2025 estimate.
A second route gives almost the same number. Orr & Boss, presenting at the CEPE annual conference in October 2024, valued the global market at €183bn for 2024 with Europe taking 22% of consumption. That implies about €40.3bn for Europe (our calculation), which is the low end of our range.
On volume, Ceresana's December 2025 study puts European demand at 9.1 million tonnes in 2024, with construction accounting for almost two-thirds of purchases.
| Measure | Figure | Period and source |
|---|---|---|
| European paints and coatings market | €40.6bn | 2024/25 estimate, European Coatings |
| Decorative coatings, Europe | €21.8bn | 2024/25 estimate, European Coatings |
| Global market, Europe share | €183bn, 22% | 2024, Orr & Boss via Coatings World |
| European demand by volume | 9.1 million tonnes | 2024, Ceresana |
| Top 25 European-headquartered producers | €28.4bn (−0.2%) | 2024, European Coatings |
| German market | €5.8bn, 1.4 million tonnes | 2025, VdL via CHEManager |
Market structure
- Four countries are half the market. Germany, France, the UK and Italy together account for nearly 50% of European demand, according to European Coatings. CEPE, the European industry body, keeps the UK inside its scope through an agreement with the British Coatings Federation.
- Germany is contracting. The German association VdL reports 2025 sales of €5.8bn, down almost 1.2%, on 1.4 million tonnes, down 2.8%. Architectural paint volume fell 3.5%, with DIY down 2% and professional trade down 4%. VdL expects volume to fall another 2% in 2026 and no recovery in building paint before 2027.
- Industrial coatings are mixed. In Germany, automotive series coatings (€608m, +1.5%) and corrosion protection (+3%) grew in 2025, while automotive refinish (€508m, −5%), furniture and wood (−3.5%) and general industry (−2%) fell.
- Concentrated at the top. The 25 largest European-headquartered producers sold €28.4bn of paints and coatings in 2024, almost unchanged on 2023. AkzoNobel led with €10.71bn, followed by BASF (€4.3bn), Jotun (€2.98bn), Hempel (€2.19bn) and DAW (€1.28bn).
How this estimate was made
- The headline is European Coatings' €40.6bn because it is the only recent Europe-wide value estimate with a segment split, published by the sector's trade journal.
- We cross-checked it by multiplying Orr & Boss's €183bn global figure for 2024 by Europe's 22% consumption share, which gives €40.3bn. That is our calculation and forms the low end of the range.
- The 2028 forecast of about €44.9bn is our own compounding of €40.6bn at the published 3.4% a year for three years. It is a projection from a published rate, not a published forecast.
- National data from VdL (Germany) and company data from the Top 25 ranking are used as structure and direction checks. The Top 25 total covers worldwide sales of European-headquartered firms, so it is not a measure of European demand.
- No official Eurostat PRODCOM total was fetched within our budget, and both value estimates are from trade press and consultancies, so confidence is medium.
Questions
How big is the European paints and coatings market?
About €40.6bn, according to European Coatings, with decorative paint at €21.8bn. Orr & Boss's global data imply about €40.3bn for Europe in 2024 (22% of €183bn). Demand is roughly 9.1 million tonnes a year, per Ceresana.
Which are the largest paint companies in Europe?
AkzoNobel (€10.71bn of paints and coatings sales in 2024), BASF (€4.3bn), Jotun (€2.98bn), Hempel (€2.19bn) and DAW (€1.28bn), according to European Coatings' 2025 Top 25 ranking. The 25 largest European-headquartered firms sold €28.4bn in total.
Is the European paint market growing?
Slowly. European Coatings forecasts 3.4% a year in value and 1.5% in volume to 2028. Germany, the largest national market, saw sales fall 1.2% to €5.8bn in 2025 and VdL expects volume to fall again in 2026.
How large is the German paint and coatings market?
€5.8bn in 2025 on 1.4 million tonnes, according to VdL. Building paints fell 3.5% by volume, industrial coatings demand fell 1.2%, and printing inks were a further €702m on 168,000 tonnes.
Sources
- European market remains a key player in global coatings industry, European Coatings, 28 March 2025.
- CEPE holds annual conference and general assembly in Denmark, Coatings World, 14 November 2024.
- Paints and Coatings Market Report – Europe (7th edition), Ceresana, December 2025.
- Farbenbranche malt weiter grau, CHEManager (reporting VdL figures), 12 February 2026.
- Top 25: The largest coatings manufacturers in Europe 2025, European Coatings, 19 May 2025.