India petroleum refining market size 2026

India had 267.1 million tonnes a year of refining capacity across 24 refineries on 1 April 2026, according to PPAC, and refiners run above nameplate. IOCL processed 75.5 million tonnes and Reliance 80 million tonnes in FY26. Here are the figures and the expansion plans.

High confidenceResearched 2 November 20266 linked sources
Market size 2026
267.1 million tonnes a year of refining capacity
Range
256–267 million tonnes a year (January 2025 to April 2026)
Forecast
300–309 million tonnes a year by 2028
Growth
about 4% capacity growth (January 2025 to April 2026); crude runs up 2% in early 2025

Market size

India's refining sector is measured in tonnes rather than rupees. The Petroleum Planning and Analysis Cell (PPAC), the oil ministry's statistics arm, lists 267.1 million tonnes a year (MMTPA) of installed refining capacity on 1 April 2026 across 24 refineries, one of which (CPCL's Cauvery Basin unit) is being rebuilt and counts as zero.

S&P Global Commodity Insights reports crude runs of 5.49 million barrels a day in January to May 2025, up more than 2% on a year earlier, at 106% of nameplate in May. IndianOil processed 75.45 million tonnes in FY26 at 107.4% utilisation and Reliance 80.0 million tonnes. Capacity was about 256 MMTPA in January 2025, so it grew about 4% in 15 months (our calculation).

CompanyRefineriesCapacity, 1 April 2026 (MMTPA)Throughput
Indian Oil (IOC)970.2575.45 MMT (FY26)
Reliance Industries268.2080.0 MMT (FY26)
Bharat Petroleum (BPCL)335.3040.5 MMT (FY25)
Hindustan Petroleum (HPCL)224.50
Nayara Energy120.00
MRPL115.00
HMEL111.30
CPCL2 (1 operating)10.50
HPCL Rajasthan (HRRL)19.00started 2025
NRL and ONGC23.07
Total24267.12

Market structure

  • Two companies hold half the capacity. IOC (70.25 MMTPA) and Reliance (68.20 MMTPA) together have 52% of the total (our calculation).
  • Utilisation above 100% is normal. In May 2025 state refiners ran at 108% and private refiners at 102%, according to S&P Global. BPCL's FY25 throughput of 40.5 million tonnes was 115% of capacity.
  • Expansion pipeline. The petroleum minister targeted about 309 MMTPA by 2028; S&P Global estimated about 300 MMTPA, 58% of the growth from brownfield projects. CPCL's new 9 MMTPA Cauvery Basin refinery is expected by end-2027.

How this estimate was made

  1. The headline is PPAC's installed capacity table as at 1 April 2026, the official source, quoted as published (267.116 MMTPA).
  2. The range runs from the minister's January 2025 figure of about 256 MMTPA (reported by S&P Global) to the April 2026 PPAC total, the same measure 15 months apart.
  3. Throughput figures are company results for IOC (FY26), Reliance (FY26) and BPCL (FY25). We did not fetch a PPAC annual throughput total, so there is no national FY26 tonnage here; S&P Global's run data is in barrels a day and we have not converted it.
  4. The 2028 forecast is the range between the minister's 309 MMTPA and S&P Global's 300 MMTPA. Capacity shares are our own arithmetic from the PPAC table.

Questions

What is India's refining capacity?

267.1 million tonnes a year across 24 refineries on 1 April 2026, according to PPAC, with 300 to 309 million tonnes a year targeted by 2028.

Who is India's largest refiner?

Indian Oil Corporation, with nine refineries and 70.25 MMTPA of capacity; it processed 75.45 million tonnes in FY26. Reliance has 68.20 MMTPA at Jamnagar and processed 80.0 million tonnes.

How much crude does India refine?

About 5.49 million barrels a day in January to May 2025, according to S&P Global, at run rates above 105% of nameplate. IOC, Reliance and BPCL alone processed about 196 million tonnes in their latest years (our addition).

Is India's refining capacity growing?

Yes. Capacity rose from about 256 MMTPA in January 2025 to 267.1 MMTPA in April 2026, and planned projects take it to 300–309 MMTPA by 2028.

Sources

  1. Installed refinery capacity, Petroleum Planning and Analysis Cell, Ministry of Petroleum and Natural Gas, as at 1 April 2026.
  2. IndianOil standalone results FY 2025-26, Indian Oil Corporation, 18 May 2026.
  3. Media release: RIL Q2 FY2026-27 financial and operational performance, Reliance Industries, 30 October 2026.
  4. India's refining capacity to expand 20% by 2028 on robust run rates, demand growth, S&P Global Commodity Insights, 7 January 2025.
  5. India's crude throughput could take a breather after posting robust runs in H1, S&P Global Commodity Insights, 10 July 2025.
  6. BPCL refineries utilise 115 pc capacity at record 40.5 mn tonnes in FY25: Hardeep Puri, Sakshi Post, 2 May 2025.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.