the decision pattern.TDP.

India plastic packaging market size 2025

India's plastic packaging market is worth $13.2bn to $22.4bn in 2025, depending on which paid report you read. Packaging takes about 59% of India's plastic use, which reached 28 million tonnes in FY25. Here are the value, volume, waste and EPR figures.

Indicative estimateResearched 2 November 20266 linked sources
Market size 2025
$13.2bn–$22.4bn
Range
$13.2bn (IMARC) – $22.44bn (Mordor Intelligence), both for 2025
Forecast
$26.89bn by 2031 (Mordor); $17.3bn by 2034 (IMARC)
Growth
about 3.1% a year (2026–2031, both publishers)

Market size

There is no official measure of India's plastic packaging market in rupees, so the headline comes from paid-report publishers, and they disagree. Mordor Intelligence puts the market at $22.44bn in 2025, growing to $26.89bn by 2031; IMARC puts it at $13.2bn in 2025, growing to $17.3bn by 2034. The two differ by 70%, hence low confidence. At about ₹85 to the dollar that is roughly ₹1.1 lakh crore to ₹1.9 lakh crore (our calculation). Both agree growth is slow, about 3.1% a year.

Volume figures are firmer. A CSIRO and TERI material-flow study found packaging took about 59% of India's plastic consumption in 2018–19 (flexible 42%, rigid 17%), when consumption was about 16.9 million tonnes. Plastindia Foundation projected 22 million tonnes for 2022–23, and polymer demand reached 28.19 million tonnes in FY2024–25.

MeasureFigurePeriodSource
Plastic packaging market value$22.44bn2025Mordor Intelligence
Plastic packaging market value$13.2bn2025IMARC
Packaging share of plastic consumptionabout 59%2018–19CSIRO / TERI
Polymer demand, all uses28.19 million tonnesFY2024–25The Secretariat
Plastic waste generated (CPCB)4.13 million tonnes2020–21MoEFCC via PIB

Market structure

  • Flexible packaging leads. Mordor gives flexible packaging 54.05% of 2025 value, pouches and sachets 31.85% of product forms and polyethylene 37.78% of material. Food is the largest end use at 27.95%.
  • A large converting base. India has over 2.56 lakh plastics processing machines, and the whole plastics ecosystem is valued at about ₹9.03 lakh crore for FY2024–25 (The Secretariat); packaging is one part of that.
  • Recycling. Plastindia estimates about 90% of rigid plastics and 60% of flexible plastic waste are recycled; CSIRO put overall recycling at about 61%, with 27% mismanaged.

Waste and regulation

  • CPCB waste counts. Reported plastic waste generation rose from 1.57 million tonnes in 2016–17 to 4.13 million tonnes in 2020–21. Later press-reported figures (2.68 million tonnes for 2023–24, 1.76 million tonnes for 2024–25) rest on incomplete state reporting, so we do not read them as a real fall.
  • Extended producer responsibility. Registered producers, importers and brand owners had an EPR obligation of about 3 million tonnes of plastic packaging in 2022–23, against 2.5 million tonnes of certificates generated by processors. By January 2026 there were 57,746 registered obligated entities and 3,012 registered plastic waste processors.
  • Packaging waste was 8.68 million tonnes in 2018–19 (6.24 million flexible, 2.44 million rigid) according to CSIRO.

How this estimate was made

  1. We could not find an official or industry-body value for plastic packaging alone, so the headline is a range between the two paid reports we could read (IMARC and Mordor), both with 2025 base years. We do not pick a midpoint because their scopes are undocumented.
  2. For a volume cross-check (our calculation): applying CSIRO's 59% packaging share to the FY2024–25 polymer demand of 28.19 million tonnes gives roughly 16 to 17 million tonnes of plastic used in packaging. The share is from 2018–19.
  3. CSIRO's 16.94 million tonnes and Plastindia's 22 million tonnes are for different years and definitions, so we list them separately.
  4. Forecasts are the publishers' own: Mordor's $26.89bn by 2031 and IMARC's $17.3bn by 2034, both at about 3.1% a year.
  5. Missing: a current Plastindia or AIPMA packaging-specific value, and a consistent CPCB waste series after 2020–21.

Questions

How big is the plastic packaging market in India?

Between $13.2bn (IMARC) and $22.44bn (Mordor Intelligence) in 2025, roughly ₹1.1 lakh crore to ₹1.9 lakh crore. There is no official figure, and the paid reports disagree by 70%.

How much plastic does India consume?

Polymer demand was 28.19 million tonnes in FY2024–25 and is projected to pass 42 million tonnes by FY2030–31. Packaging takes about 59% of plastic use, according to a CSIRO/TERI material-flow study.

How much plastic waste does India generate?

CPCB reported 4.13 million tonnes in 2020–21, up from 1.57 million tonnes in 2016–17. Packaging made up most of it: CSIRO estimated 8.68 million tonnes of packaging waste in 2018–19 on a wider definition.

Is flexible or rigid packaging bigger in India?

Flexible. Mordor gives it 54.05% of 2025 market value, and CSIRO found flexible packaging was 42% of plastic consumption against 17% for rigid.

Sources

  1. India plastic packaging market size and share analysis, Mordor Intelligence, updated 27 July 2026.
  2. India plastic packaging market size, share, trends and forecast 2026–2034, IMARC Group, updated 29 September 2026.
  3. A material flow analysis of polymers and plastics in India, CSIRO and TERI, September 2021 (2018–19 data).
  4. Plastic report says consumption will reach 22 million MT in 2022-23, PrintWeek India (reporting Plastindia Foundation), undated (about 2022).
  5. Plastic waste generation in the country, Press Information Bureau, Ministry of Environment, Forest and Climate Change, 27 July 2023.
  6. Elephantine plastic waste: now Indian packagers face stricter rules, The Secretariat, 9 September 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.