the decision pattern.TDP.

US podcast advertising market size 2025

US podcast advertising revenue reached $2.9bn in 2025, up 17.6%, according to the IAB/PwC Internet Advertising Revenue Report. That is about a third of the $8.4bn digital audio market. iHeartMedia and SiriusXM both reported podcast ad growth above 25%.

Medium confidenceResearched 2 November 20269 linked sources
Market size 2025
$2.9bn
Range
$2.9bn measured (IAB/PwC) against a $3bn+ projection made during 2025
Forecast
$3.0bn–$3.4bn in 2026 (our own scenario, not a published forecast)
Growth
up 17.6% year on year (2025)

Market size

US podcast advertising revenue was $2.9bn in 2025, up 17.6% on 2024, according to the IAB/PwC Internet Advertising Revenue Report published in April 2026 and reported by Inside Radio and Barrett Media. Podcasts sat inside a digital audio market of $8.4bn (up 10.2%), which was itself only 2.8% of the $294.6bn US internet advertising market. Working back from the growth rate, 2024 revenue was about $2.47bn (our calculation).

The measured figure came in a little below expectations. In October 2025 the IAB said podcasting was "projected to top $3 billion in advertising revenue for the first time" in 2025, while trimming its growth outlook to 4.8% from 6.2%. Actual growth of 17.6% was far stronger, but the total still landed at $2.9bn, so we show both numbers. The IAB's history shows the compounding: $1.9bn in 2023 (up 5%), and a May 2024 forecast of "nearly $2.6bn by 2026" that the market passed a year early.

MeasureFigurePeriodSource
US podcast advertising revenue$2.9bn, up 17.6%2025IAB/PwC via Inside Radio
US digital audio advertising$8.4bn, up 10.2%2025IAB/PwC via Inside Radio
US internet advertising$294.6bn, up 13.9%2025IAB/PwC via Inside Radio
US podcast advertising revenue$1.9bn, up 5%2023IAB/PwC
IAB projection for 2025top $3bnmade October 2025IAB via Adweek
iHeartMedia podcast revenue$563.7m, up 25.6%2025iHeartMedia via Radio Ink
SiriusXM podcast advertisingup 41%2025SiriusXM via PPC Land

Who is selling it

  • iHeartMedia is the largest publicly reported seller. Podcast revenue rose 25.6% to $563.7m in 2025, about a fifth of the IAB total (our calculation), inside Digital Audio Group revenue of $1.329bn (up 14.2%) and total company revenue of $3.865bn (up 0.3%). It expects programmatic revenue of about $200m in 2026, up from $135m.
  • SiriusXM's podcast business is growing fastest. Podcast advertising revenue grew 41% in 2025 after 12% in 2024, while total SiriusXM advertising revenue was roughly flat at $1.77bn and Pandora and Off-platform advertising rose 1% to $1.62bn. Podcasts are the only part of its ad business growing quickly.
  • Audiences keep widening. Edison Research's Infinite Dial 2026 found 80% of Americans aged 12 and over have listened to or watched a podcast, and 57% have done both, so video is now part of the ad proposition. Among people aged 55 and over, monthly podcast consumption rose from 38% to 58% in a year. Online audio reaches 81% of the population monthly, about 233 million people.

How this estimate was made

  1. The headline is the IAB/PwC measurement of $2.9bn for 2025, the industry's reference survey of US podcast ad revenue. We read it via two trade reports of the April 2026 release because the IAB's own study pages are gated.
  2. The range pairs that measurement with the IAB's October 2025 projection that revenue would top $3bn, a gap of about 3%.
  3. The 2024 base of about $2.47bn is our calculation ($2.9bn divided by 1.176), not a published figure.
  4. The 2026 forecast is our own scenario, not a published forecast. Applying between the IAB's cautious 4.8% autumn 2025 growth outlook and the 17.6% actually achieved in 2025 gives $3.0bn to $3.4bn.
  5. What is missing: the study's breakdown by ad format, genre and advertiser category, which sits behind a login. Company scopes differ: iHeartMedia's podcast revenue includes non-advertising income, and SiriusXM reports growth rates only.

Questions

How big is the US podcast advertising market?

$2.9bn in 2025, up 17.6% on 2024, according to the IAB/PwC Internet Advertising Revenue Report. That is roughly a third of the $8.4bn US digital audio advertising market.

How fast is podcast advertising growing?

Revenue grew 17.6% in 2025, faster than digital audio overall (10.2%) and faster than US internet advertising (13.9%). Growth had slowed to 5% in 2023 before recovering.

Who makes the most money from podcast advertising?

Among public companies, iHeartMedia reported $563.7m of podcast revenue in 2025, up 25.6%. SiriusXM reported 41% growth in podcast advertising but does not disclose the dollar figure.

How many Americans listen to podcasts?

Edison Research's Infinite Dial 2026 found that 80% of Americans aged 12 and over have listened to or watched a podcast, and 57% have done both.

Sources

  1. Digital audio ad spend sets new record at $8.4 billion, Inside Radio (IAB/PwC data), 16 April 2026.
  2. Digital audio ad spending hits $8.4 billion in 2025, new IAB data shows, Barrett Media (IAB/PwC data), 16 April 2026.
  3. Podcast revenue growth slowed in 2023, will return to double-digit growth in 2024, according to IAB's U.S. Podcast Advertising Study, IAB, 9 May 2024.
  4. IAB: Podcasts buck US ad slowdown with 4.8% growth forecast, Radio Ink (IAB data), 1 October 2025.
  5. Podcast ad spend to surpass $3 billion in 2025, IAB projects, Adweek, 1 October 2025.
  6. iHeartMedia cuts full-year net loss in half as digital audio grows, Radio Ink, 3 March 2026.
  7. SiriusXM beats guidance with $1.26B free cash flow as podcast ads surge 41%, PPC Land, 11 February 2026.
  8. Four out of five U.S. adults have listened to or watched a podcast, Tubefilter (Edison Research Infinite Dial 2026), 20 March 2026.
  9. Report: Online audio, podcast use hit new highs, Editor and Publisher (Edison Research), 14 May 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.