the decision pattern.TDP.

Europe port operations market size 2024

EU ports handled about 3.4bn tonnes of goods in 2024, unchanged on 2023 and below the 3.6bn-tonne 2019 peak, according to Eurostat. Port activities generate roughly €33bn of gross value added a year and employ more than 410,000 people directly.

Medium confidenceResearched 2 November 20267 linked sources
Market size 2024
3.4bn tonnes handled; about €33bn gross value added
Range
3.4bn–3.6bn tonnes (2024 volume to 2019 peak)
Forecast
3.4bn–3.6bn tonnes a year by 2030 (our scenario)
Growth
flat in 2024; top-15 container ports up 5.9% in 2024

Market size

Eurostat's measure of the sector is volume: EU ports handled about 3.4bn tonnes of goods in 2024, the same as in 2023 and still below the 3.6bn tonnes recorded in 2019, the peak of the decade. Rotterdam (397m tonnes), Antwerp-Bruges (244m tonnes) and Hamburg (97m tonnes) were the three largest ports. Only four of the top ten ports grew in 2024, led by Valencia (+3.6%) and Algeciras (+2.6%), while Constanța (-14.3%) and Gdańsk (-11.0%) fell.

In money terms the European Commission's Blue Economy Observatory puts EU port activities (cargo handling, warehousing, services incidental to water transport and water projects) at 13% of blue economy gross value added. On our calculation that is about €32.6bn on the 2022 blue economy GVA of €250.7bn, and the Observatory's 2023 sub-sector figures (over €13bn for services incidental to water transport, €12bn for warehousing, about €8bn for cargo handling and water projects) sum to roughly €33bn, the largest on record. These are value-added figures, not revenue, and cover the EU-27 only.

MeasureValuePeriod / source
Goods handled, EU ports3.4bn tonnes2024, Eurostat
Goods handled, EU ports3.4bn tonnes (-3.9%)2023, Eurostat
Goods handled, EU ports3.6bn tonnes2019 peak, Eurostat
Port activities GVAabout €33bn (our calculation)2022–2023, Blue Economy Observatory
Direct employment in port activitiesover 410,0002023, Blue Economy Observatory
Top-15 EU container ports76.8m TEU (+5.9%)2024, PortEconomics
Port of Rotterdam throughput428.4m tonnes (-1.7%)2025, Port of Rotterdam Authority

Market structure

  • Bulk energy still dominates tonnage. Coal, crude oil and gas made up 19.0% of EU port volume in 2024 and refined petroleum products 16.5%; ores and chemicals were about 7% each. Falling coal and oil-product volumes explain why total tonnage is flat while containers grow.
  • Containers are concentrated in the north. Rotterdam (13.82m TEU) and Antwerp-Bruges (13.53m TEU, +8.1%) handled more than a third of the top-15 total of 76.8m TEU in 2024; Hamburg stagnated at 7.8m TEU. Rotterdam reached 14.2m TEU in 2025 (+3.1%).
  • Netherlands, Italy and Spain lead by country. In 2023 the Netherlands handled 545m tonnes, Italy 501m and Spain 472m, together about 45% of the EU total on our calculation.
  • Germany leads in value added. Germany accounts for 21% of port activities GVA and of the workforce; the Netherlands, France, Spain and Italy together add 49.4% of GVA.
  • Operator economics. The Port of Rotterdam Authority earned €940.4m of revenue in 2025 (+6.6%) and €583.6m EBITDA. Terminal operator HHLA grew revenue 9.9% to €1,756m and container throughput 5.4% to 6.3m TEU in 2025.

How this estimate was made

  1. The headline volume is Eurostat's 2024 figure of about 3.4bn tonnes, published in December 2025 and reported by Hellenic Shipping News; Eurostat's own November 2024 release gives the 2023 base of 3.4bn tonnes (-3.9% on 2022).
  2. The value figure is our calculation: 13% (port activities' share of blue economy GVA, Blue Economy Observatory) multiplied by €250.7bn (EU blue economy GVA 2022, Blue Economy Report 2025) gives €32.6bn; the Observatory's 2023 sub-sector values sum to roughly €33bn. We have not found a published turnover figure for the sector, so confidence is medium.
  3. Scope note: Eurostat's port tonnage (Rotterdam 397m tonnes in 2024) and the port authority's own throughput (428.4m tonnes in 2025) use different definitions, so they are not comparable year to year.
  4. The 2030 outlook is our own scenario, not a published forecast: flat bulk-energy volumes offset by container growth keep EU tonnage between the 2024 level and the 2019 peak.
  5. "Europe" here means the EU-27. UK, Norwegian and Turkish ports are excluded from all figures.

Questions

How much cargo do European ports handle?

EU ports handled about 3.4bn tonnes of goods in 2024, according to Eurostat, unchanged on 2023 and below the 3.6bn tonnes of 2019. Rotterdam alone handled 397m tonnes.

How big is the port industry in Europe in money terms?

Port activities account for 13% of EU blue economy gross value added, about €33bn a year on our calculation from European Commission data, and employ more than 410,000 people directly, around 1.5 million including seasonal and part-time work.

Which is the busiest port in Europe?

Rotterdam, with 397m tonnes in 2024 (Eurostat) and 13.82m TEU of containers. Antwerp-Bruges is second with 244m tonnes and 13.53m TEU, and grew containers 8.1% in 2024.

Is European port traffic growing?

Total tonnage is flat: 3.4bn tonnes in both 2023 and 2024. Container volumes are growing, up 5.9% across the top-15 EU ports in 2024, while coal and oil-product volumes fall.

Sources

  1. EU ports handled 3.4 bn tonnes of freight in 2024, Hellenic Shipping News (reporting Eurostat), 6 December 2025.
  2. EU ports handled 3.4 billion tonnes of freight in 2023, Eurostat, 26 November 2024.
  3. Port activities, EU Blue Economy Observatory, European Commission, updated 21 May 2026.
  4. The EU Blue Economy Report 2025: Executive summary, European Commission, 2025.
  5. Throughput in the port of Rotterdam shows a slight decline, Port of Rotterdam Authority, 26 February 2026.
  6. Top-15 EU container ports in 2024, PortEconomics (Theo Notteboom), 27 February 2025.
  7. HHLA records solid growth in an uncertain environment, Hamburger Hafen und Logistik AG, 2026 (preliminary 2025 figures, ahead of the 26 March 2026 annual report).

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.