the decision pattern.TDP.

Brazil poultry market size 2025

Brazil produced 15.29 million tonnes of chicken meat in 2025 and exported a record 5.32 million tonnes worth US$9.8bn, according to ABPA's 2026 annual report. IBGE's narrower slaughter count gives 14.2 million tonnes. Here are the figures, buyers and the 2026 outlook.

High confidenceResearched 2 November 20265 linked sources
Market size 2025
15.29 million tonnes of chicken meat
Range
14.2–15.3 million tonnes (IBGE inspected-slaughter data vs ABPA total)
Forecast
15.7 million tonnes in 2026 (USDA FAS)
Growth
about 2% a year (2025–2026, ABPA and USDA)

Market size

Brazil's poultry industry body ABPA puts chicken meat production at 15.29 million tonnes in 2025, in its Relatório Anual 2026 published in April 2026. Exports reached a record 5.324 million tonnes, up 0.6% on 2024, and earned US$9.79bn, down 1.4% because average prices fell. Domestic consumption was 46.7 kg per person.

The statistics office IBGE counts only inspected slaughter and reports 14.2 million tonnes for 2025, up 3.4%, also a record. The gap of about one million tonnes is uninspected and on-farm slaughter that ABPA includes, so the two figures measure different things.

Measure20242025Source
Chicken meat production (ABPA scope)not stated in fetched sources15.289 million tonnesABPA Relatório Anual 2026
Chicken meat production (inspected slaughter)13.7 million tonnes (our calculation from +3.4%)14.2 million tonnesIBGE via S&P Global
Exports, volume5.294 million tonnes5.324 million tonnesABPA
Exports, valueUS$9.928bnUS$9.790bnABPA
Per-capita consumptionnot stated46.7 kgABPA
Production forecast15.7 million tonnes (2026)USDA FAS

Who is buying

  • About 35% of output is exported (5.324 of 15.289 million tonnes, our calculation). Brazil is the world's largest chicken exporter.
  • The Gulf is the biggest customer. In 2025 the United Arab Emirates took 479,900 tonnes (up 5.5%), Saudi Arabia 397,200 tonnes (up 7.1%), and Japan 402,900 tonnes (down 0.9%). South Africa bought 336,000 tonnes and the Philippines 264,200 tonnes (up 12.5%).
  • China fell back. China was the top destination in 2024 at 562,200 tonnes but dropped out of the 2025 top five after Brazil's first commercial avian influenza outbreak. December 2025 shipments to the EU rose 52% as markets reopened.
  • Growth is steady, not fast. Production rose 3.4% on IBGE's measure in 2025; ABPA expects about 2.2% growth in 2026 and USDA FAS forecasts 15.7 million tonnes, about 2% higher.

How this estimate was made

  1. The headline is ABPA's 2025 production figure of 15.289 million tonnes, because ABPA's annual report is the industry's standard reference and covers all production, not just inspected slaughter.
  2. The range runs from IBGE's 14.2 million tonnes (inspected slaughter, reported by S&P Global Commodity Insights) to ABPA's total. We treat these as different scopes, not a conflict.
  3. Export volumes and values for 2024 and 2025 are ABPA data as reported by The Poultry Site and Safras & Mercado.
  4. The 2026 forecast is USDA FAS's 15.7 million tonnes, reported by The Poultry Site. ABPA's own 2026 projection of about 2.2% growth, reported by S&P Global, points to a similar level (about 15.6 million tonnes, our calculation).
  5. This page is in tonnes; none of the fetched sources gives a value for the whole market in reais, so we do not give one.

Questions

How much chicken does Brazil produce?

Brazil produced 15.29 million tonnes of chicken meat in 2025, according to ABPA's 2026 annual report. IBGE's count of inspected slaughter alone was 14.2 million tonnes.

How much chicken does Brazil export?

A record 5.324 million tonnes in 2025, worth US$9.79bn, according to ABPA. That is about 35% of production. The UAE, Japan and Saudi Arabia were the three largest buyers.

Who buys Brazilian chicken?

In 2025 the UAE (479,900 tonnes), Japan (402,900), Saudi Arabia (397,200), South Africa (336,000) and the Philippines (264,200) led. China, the top buyer in 2024, cut purchases after the 2025 avian influenza outbreak.

Will Brazilian chicken production grow in 2026?

Yes, modestly. USDA FAS forecasts 15.7 million tonnes in 2026, about 2% more than 2025, and ABPA expects growth of about 2.2% in production, exports and consumption.

Sources

  1. ABPA lança Relatório Anual 2026 com dados oficiais da avicultura e da suinocultura do Brasil, Notícias Agrícolas (ABPA Relatório Anual 2026), 29 April 2026.
  2. Exportações de carne de frango confirmam projeções positivas e fecham 2025 com alta de 0,6%, aponta ABPA, Safras & Mercado (ABPA data), 7 January 2026.
  3. Brazil chicken meat exports grew 3% in 2024, The Poultry Site (ABPA data), 10 January 2025.
  4. Brazil sets new poultry production record in 2025, S&P Global Commodity Insights (IBGE and ABPA data), 13 February 2026.
  5. Brazil chicken output set for record growth in 2026, The Poultry Site (USDA FAS data), 20 March 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.