the decision pattern.TDP.

Global precision castings market size 2024

The world investment casting industry, the core of precision castings, had sales of $17.2bn in 2024 according to the Investment Casting Institute. About 65% came from aerospace, defence and gas turbine parts, and North America made 43% of the total.

Medium confidenceResearched 2 November 20265 linked sources
Market size 2024
$17.2bn
Range
$17.0bn–$17.7bn (2025 estimates from Research and Markets and IMARC)
Forecast
$22.8bn by 2032 (Research and Markets); $23.0bn by 2034 (IMARC)
Growth
2.86%–4.3% a year (2025–2032/2034)

Market size

The Investment Casting Institute (ICI), the industry's trade body, puts world investment casting sales at $17.2bn in 2024, using data from INCAST. Investment casting (the lost-wax process) is the main precision casting process, so we use it as the scope for this page.

Two paid-report publishers give similar 2025 figures: Research and Markets puts the market at $17.0bn and IMARC at $17.7bn. The close agreement with the ICI's 2024 figure gives a range of $17.0bn to $17.7bn. Their forecasts differ more: Research and Markets expects $22.8bn by 2032 (4.3% a year), IMARC $23.0bn by 2034 (2.86% a year).

MeasureValuePeriodSource
World investment casting sales$17.2bn2024Investment Casting Institute
Aerospace, defence and gas turbines$11.24bn2024Investment Casting Institute
General industry$4.27bn2024Investment Casting Institute
Automotive$1.70bn2024Investment Casting Institute
Market estimate$17.0bn2025Research and Markets
Market estimate$17.7bn2025IMARC

Market structure

  • High-value parts dominate. Aerospace, defence and industrial gas turbine castings made up about 65% of 2024 sales. North America ($6.16bn), Europe ($3.36bn) and China ($1.15bn) together produced 94% of that segment.
  • North America is the largest producer. It made $7.34bn of castings in 2024, nearly 43% of the world total, with 84% of that from high value-added work. Europe made $4.21bn and China $3.58bn.
  • China leads in general industry. China produced $2.02bn of general industrial castings, ahead of North America ($850m) and India ($450m). General industry was 56% of China's output.
  • Automotive is small and European. Automotive castings were $1.70bn, led by Europe ($468m), China ($410m) and North America ($330m).
  • A few large aerospace suppliers. Howmet names Berkshire Hathaway's Precision Castparts, Doncasters and Consolidated Precision Products as its main investment casting competitors, and notes that some large engine makers cast their own airfoils.
  • Jet engine demand is the main driver. Howmet's Engine Products segment, which makes airfoils and rolled rings, had 2025 revenue of $4.3bn, up 16%, within group revenue of $8.3bn. Commercial aerospace was 53% of Howmet's 2025 sales.

How this estimate was made

  1. We use the ICI figure as the headline because it is compiled by the trade body from producer data, not modelled by a report publisher.
  2. The range uses the two 2025 paid-report estimates, which sit within 3% of the ICI's 2024 figure. That agreement is why confidence is medium rather than low, but the 2025 figures are not independent measurements.
  3. Forecasts come only from paid-report publishers. They differ on both growth rate (2.86% against 4.3% a year) and end year, and neither publishes its method.
  4. Our calculation: the three ICI segments add to $17.21bn, matching the $17.2bn total.
  5. Missing: sand and die casting are outside this scope. Precision Castparts, a major producer, does not publish its own revenue because it is part of Berkshire Hathaway.

Questions

How big is the precision castings market?

The Investment Casting Institute puts world investment casting sales at $17.2bn in 2024. Paid reports estimate $17.0bn to $17.7bn for 2025.

What is investment casting mainly used for?

About 65% of 2024 sales, $11.24bn, went to aerospace, defence and industrial gas turbines. General industry took $4.27bn and automotive $1.70bn.

Which region makes the most investment castings?

North America, with $7.34bn in 2024, nearly 43% of the world total. Europe made $4.21bn and China $3.58bn.

How fast is the precision castings market growing?

Paid-report forecasts range from 2.86% a year to 2034 (IMARC) to 4.3% a year to 2032 (Research and Markets). Aerospace suppliers are growing faster: Howmet's engine parts revenue rose 16% in 2025.

Sources

  1. World report on investment casting, Investment Casting Institute via Foundry-Planet, 11 September 2025.
  2. Investment Casting Market Report, IMARC Group, updated 30 October 2026.
  3. Investment Casting: Global Strategic Business Report, Research and Markets, October 2026.
  4. Howmet Aerospace reports fourth quarter and full year 2025 results, Howmet Aerospace via AL Circle, February 2026.
  5. Howmet Aerospace Form 10-K for 2025, US Securities and Exchange Commission, 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.