Market size
The widest published figure comes from Research and Markets, which puts UK prefabricated construction at £22.5bn in 2025, up from £21.26bn in 2024. It covers residential, commercial and institutional work and all methods and materials. It forecasts about £28.84bn by 2029 and 5% annual growth. That forecast does not quite add up: 5% a year from the 2024 base gives about £27.1bn by 2029 (our calculation).
Narrower definitions give much smaller numbers. MarketsandMarkets values UK modular construction at 6,074.4 million in 2025, rising to 7,497.7 million by 2030 (4.3% a year), but its page labels the figure in both dollars and pounds. Barbour ABI, the construction data firm, puts panelised modular building systems (timber frame, light gauge steel and precast concrete panels) at £1.26bn in 2024.
The range is wide because the sources do not measure the same thing. Treat £22.5bn as an upper bound, not the size of the modular building industry.
| Measure | Value | Period | Source |
|---|---|---|---|
| Prefabricated construction, all methods | £21.26bn | 2024 | Research and Markets |
| Prefabricated construction, all methods | £22.5bn | 2025 (estimate) | Research and Markets |
| Modular construction | 6,074.4m (currency unclear) | 2025 | MarketsandMarkets |
| Panelised modular building systems | £1.26bn | 2024 | Barbour ABI |
| Prefabricated construction forecast | £28.84bn | 2029 | Research and Markets |
Market structure
- Timber frame dominates panelised systems. It makes up about 70% of Barbour ABI's panelised market, with light gauge steel at 14% and precast concrete at 8%. Barbour ABI calls growth since the 2021 peak "slow but steady".
- Volumetric housing has shrunk. House by Urban Splash went into administration in 2022, and Ilke Homes and L&G Modular Homes both failed in 2023. Bisnow put investor losses across the three at close to £500m. Ilke alone owed creditors £320m, including £68m lent by Homes England.
- More exits in 2024. TopHat began winding down its 125,000 sq ft Derby factory in October 2024 because orders had fallen. It had built up £87m of losses, and Persimmon wrote off its £25m stake.
- Temporary and public-sector modular buildings are steadier. Shepherd Group, the owner of Portakabin, grew turnover from £393.6m to £476.4m in 2023 before Antin Infrastructure Partners bought it in a deal reported at more than £1.5bn.
How this estimate was made
- The headline is the only published total that covers all UK prefabricated construction (Research and Markets, July 2025). It comes from a paid-report publisher, so confidence is low.
- We built the range from the narrowest sourced scope (Barbour ABI panelised systems, £1.26bn) to the widest (£22.5bn). The two do not measure the same activity, so the range shows a difference in definition, not uncertainty about one number.
- We checked the 2029 forecast ourselves: 5% a year from £21.26bn gives about £27.1bn, not £28.84bn. This is our own calculation.
- MarketsandMarkets labels its modular figure inconsistently in dollars and pounds, so we leave the currency out.
- We found no ONS or trade-body total for prefabricated buildings.
Questions
How big is the UK prefabricated buildings market?
Research and Markets estimates UK prefabricated construction at £22.5bn in 2025 on a broad definition. Modular construction alone is about 6.1 billion (MarketsandMarkets), and panelised building systems were £1.26bn in 2024 (Barbour ABI).
Is modular construction growing in the UK?
Slowly. Forecasts run from 4.3% to 5% a year. Volumetric housebuilding has been through several failures: Urban Splash in 2022, Ilke Homes and L&G Modular Homes in 2023, and TopHat in 2024.
What is the most common type of off-site construction in the UK?
Timber frame panels. They account for about 70% of the panelised building systems market measured by Barbour ABI, ahead of light gauge steel (14%) and precast concrete (8%).
Sources
- U.K. Prefabricated Construction Market Intelligence and Future Growth Dynamics Databook 2025, Research and Markets via GlobeNewswire, 29 July 2025.
- UK Modular Construction Market analysis, MarketsandMarkets, undated (2025 base year).
- Panelised Modular Building Systems Market Report UK 2025-2029, Barbour ABI, 10th edition, undated (2024 data).
- Investors face £500M in losses on modular housing bets, Bisnow, 29 August 2023.
- TopHat to wind down factory operations, PBC Today, 22 October 2024.
- Portakabin: Sales surge for Portaloo inventor ahead of £1.5bn sale, City AM, 2024.