Market size
Statistics Canada reports that rail freight revenues in Canada reached C$19.5bn in 2024, up 3.6% on 2023. Freight made up 90.1% of the rail industry's C$21.6bn operating revenues; passenger services brought in C$485.8m. Shortline railways earned 7.4% of freight revenue, so the two Class I carriers, CN and CPKC, take almost all the rest.
This is the only official revenue measure, and it covers rail operations in Canada. CN's and CPKC's own revenues are larger in total because they include their US (and, for CPKC, Mexican) networks, so we do not add them up. The 2024 figure is the latest year Statistics Canada has published; its annual survey runs about 16 months behind.
| Measure | Value | Period | Source |
|---|---|---|---|
| Rail freight revenues, Canada | C$19.5bn | 2024 | Statistics Canada |
| Rail operating revenues, total | C$21.6bn | 2024 | Statistics Canada |
| Freight tonnage (annual survey) | 329.2 million tonnes | 2024 | Statistics Canada |
| Carloadings, total | 376.6 million tonnes (down 0.2%) | 2025 | Statistics Canada |
| Intermodal carloadings | 37.5 million tonnes (up 7.4%) | 2025 | Statistics Canada |
| CN total revenues (all networks) | C$17.3bn (up 2%) | 2025 | CN |
| CPKC total revenues (all networks) | C$15.1bn (up 4%) | 2025 | CPKC |
What moves on Canadian rail
- Bulk dominates. Non-intermodal traffic, mainly commodities, was 299.8 million tonnes of the 376.6 million carried in 2025. Coal was 38.5 million tonnes and wheat 31.1 million, up 14.3%.
- Western origin. Western Canada accounted for 74.6% of originating tonnage in 2024 (208.2 million tonnes).
- Intermodal at a record. Container traffic reached an all-time high of 37.5 million tonnes in 2025, with ten straight monthly gains to December.
- Trade tensions show. Freight received from US rail connections fell 13.3% to 39.3 million tonnes in 2025, its lowest since 2020. Canola fell 12.4%, which Statistics Canada linked to trade tensions with China, and lumber fell 12.1%.
- CN's mix. In 2025 CN earned C$3.9bn from intermodal, C$3.7bn from grain and fertilisers and C$3.5bn from petroleum and chemicals, out of C$16.7bn freight revenue.
- Costs. Operating expenses were C$14.1bn in 2024, giving an industry operating ratio of 0.65, unchanged on the year.
How this estimate was made
- The headline is Statistics Canada's 2024 rail freight revenue, the only official revenue figure that covers Canada alone.
- For 2025 we built a scenario: freight revenue growing at CN's reported 2% to CPKC's 4%, applied to C$19.5bn. That gives C$19.9bn to C$20.3bn (our calculation). It is our own scenario, not a published forecast, and it assumes Canadian pricing tracked the companies' system-wide results while tonnage was flat.
- The tonnage figures differ by source: the annual survey (329.2 million tonnes in 2024) counts freight once, while the monthly carloadings series (376.6 million in 2025) includes 39.3 million tonnes received from US connections. We do not mix them.
- Missing: a published multi-year forecast for Canadian rail freight revenue.
Questions
How big is the rail freight industry in Canada?
Canadian railways earned C$19.5bn in freight revenue in 2024, according to Statistics Canada, out of C$21.6bn total rail operating revenues.
How much freight do Canadian railways carry?
Railways loaded 376.6 million tonnes in 2025, including freight received from the US, down 0.2% on 2024. Intermodal traffic hit a record 37.5 million tonnes.
Who are the largest rail freight companies in Canada?
CN and CPKC. CN reported C$17.3bn of revenue in 2025 and CPKC C$15.1bn, both including their operations outside Canada. Shortlines earn about 7.4% of Canadian freight revenue.
Did Canadian rail freight grow in 2025?
Volumes were flat: total tonnage fell 0.2%. Higher wheat shipments and record intermodal traffic offset falls in canola, lumber, crude and freight from US connections.
Sources
- Rail transportation, 2024, Statistics Canada, The Daily, 28 April 2026.
- Railway carloadings, December 2025, Statistics Canada, The Daily, 24 February 2026.
- CN reports fourth-quarter and full-year 2025 results (Form 6-K), Canadian National Railway, 30 January 2026.
- CPKC showcases strength of Precision Scheduled Railroading; delivers record margins, CPKC, 28 January 2026.
- Strong grain shipments by rail offset freight losses in 2025, Alberta Farmer Express, 24 February 2026.