Market size
India installed 7.1 GW of rooftop solar in calendar 2025, up 122% from 3.2 GW in 2024, according to Mercom India data reported by pv magazine. Cumulative rooftop capacity reached 20.8 GW at the end of 2025. A government summary from December 2025 gives a slightly higher grid-connected rooftop figure of 22.42 GW, from a different data set, so we show the installed base as a range.
This page measures the market in capacity. Sourced installed prices per kW vary widely by system size and state, so the full report builds the rupee value from current price quotes.
| Measure | Value | Date |
|---|---|---|
| Rooftop capacity added | 7.1 GW | 2025 |
| Rooftop capacity added | 3.2 GW | 2024 |
| Cumulative rooftop capacity | 20.8 GW (Mercom) to 22.42 GW (government) | End 2025 |
| PM Surya Ghar households with rooftop solar | 23.9 lakh, then 25 lakh | Early and late December 2025 |
| PM Surya Ghar capacity | 7 GW | December 2025 |
| PM Surya Ghar subsidy released | ₹13,464.6 crore | December 2025 |
Who is buying
- Homes. About 76% of capacity added in 2025 was residential, roughly 5.4 GW. This is the effect of PM Surya Ghar Muft Bijli Yojana, approved in February 2024 with an outlay of ₹75,021 crore and a target of one crore households.
- Industry and business. Industrial roofs took 18% of 2025 additions, commercial 5% and government buildings 1%.
- Ownership. 85% of 2025 installations were bought outright (capex). The other 15% were opex or RESCO deals, where a developer owns the system and sells the power.
- States. Maharashtra and Gujarat each took 16% of 2025 additions and Uttar Pradesh 15%. Gujarat holds almost a quarter of the cumulative base.
How this estimate was made
- Capacity added and the installed base come from Mercom India's annual rooftop report, as reported by pv magazine in February 2026.
- We cross-checked the installed base against the government's December 2025 figure of 22.42 GW. The gap of about 1.6 GW comes from different data sets and dates, so we publish both ends as the range.
- Scheme numbers (households, capacity, subsidy, outlay) come from the Press Information Bureau and from ministry statements reported by ANI and Outlook Business.
- The residential figure of about 5.4 GW is our own calculation: 76% of 7.1 GW.
Outlook
The scheme target of one crore homes is about four times the 25 lakh reached by December 2025, so household demand should keep leading the market while subsidy funds flow. The pace depends on subsidy release, on how fast power distribution companies approve net metering, and on module supply under India's domestic content rules.
Questions
How much rooftop solar does India have?
India had about 20.8 GW of rooftop solar at the end of 2025 according to Mercom India. Government figures put grid-connected rooftop capacity at 22.42 GW.
How much rooftop solar did India install in 2025?
India installed 7.1 GW of rooftop solar in 2025, up 122% from 3.2 GW in 2024. About 76% of it was on homes.
How many homes have rooftop solar under PM Surya Ghar?
About 23.9 lakh households had installed systems by early December 2025, with 7 GW of capacity, and the minister reported 25 lakh by late December. The target is one crore households.
Sources
- India installs 7.1 GW rooftop solar in 2025 as residential demand surges, pv magazine, 26 February 2026.
- India installs 7.1 GW of rooftop solar in 2025, up 122% YoY, pv magazine India, 26 February 2026.
- India's Solar Momentum, Press Information Bureau, 6 December 2025.
- Nearly 24 lakh households have adopted rooftop solar under PM Surya Ghar, The Tribune (ANI), 7 December 2025.
- India records record renewable capacity addition in 2025, Outlook Business, 30 December 2025.