Market size
The most direct measurement is from the French Circular Fashion Federation (FMC) and KPMG, which put Europe's second-hand apparel market at €15.9bn in 2024 and forecast €26bn by 2030, a compound growth rate of 8.5% a year. Applying that rate for one year gives our desk estimate of about €17.3bn for 2025. France was the largest national market, with 26% of European second-hand fashion revenue in 2024.
Second-hand is growing faster than new clothing. BCG and Vestiaire Collective put global growth at about 10% a year, three times the first-hand market, and expect up to $360bn globally by 2030. ThredUp's 2026 Resale Report, with GlobalData, describes a $393bn global second-hand apparel market, though the release is unclear whether that is a current or 2030 figure. Both global numbers use wider scopes than the Europe figure.
| Measure | Figure | Period | Source |
|---|---|---|---|
| Europe second-hand apparel market | €15.9bn | 2024 | FMC / KPMG |
| Europe second-hand apparel (desk estimate) | €17.3bn | 2025 | Our roll-forward at 8.5% |
| Europe second-hand apparel forecast | €26bn | 2030 | FMC / KPMG |
| Online second-hand sales, all categories, five largest markets | €21.6bn | 2024 | Amazon / CEBR |
| Vinted gross merchandise value | €10.8bn | 2025 | Vinted results |
| Global second-hand fashion and luxury forecast | up to $360bn | 2030 | BCG / Vestiaire Collective |
Market structure
- Vinted is the scale player. Its gross merchandise value rose 47% to €10.8bn in 2025, revenue rose 38% to €1.1bn and profit fell 19% to €62m as it invested in expansion. It operated in 26 countries after launching in Latvia, Estonia and Slovenia.
- Fashion leads online resale. The Amazon-commissioned CEBR study valued online sales of used and returned goods across Germany, France, the UK, Italy and Spain at €21.6bn in 2024 (Germany above €6.5bn, France €5.8bn, the UK €5bn). In Germany, 52% of second-hand buyers bought clothing, ahead of small appliances (39%).
- Younger shoppers drive demand. Resale makes up 39% of Gen Z wardrobes in Europe, against 66% in the US (BCG/Vestiaire). In the CEBR study, 85% of under-34s had bought second-hand online, against 52% of over-55s.
How this estimate was made
- The headline is the FMC/KPMG study presented in Paris in April 2025, the only recent Europe-wide value we found that is limited to apparel. It is a consultancy estimate, not official statistics.
- For 2025 we applied the study's own 8.5% growth rate: €15.9bn multiplied by 1.085 is about €17.3bn (our calculation, not a published figure). The range runs from the measured 2024 value to that roll-forward.
- Vinted's 2025 gross merchandise value of €10.8bn is a cross-check. Vinted sells some non-fashion items, operates outside the EU and reports GMV rather than revenue, so the figures are not directly comparable, but its scale suggests the FMC figure is conservative.
- The CEBR figure of €21.6bn covers all categories, five countries and online sales only, so it is reported separately.
- The ThredUp/GlobalData and BCG/Vestiaire global figures differ in scope from each other and from the Europe figure, so we do not derive a Europe share from them.
Questions
How big is the second-hand fashion market in Europe?
About €15.9bn in 2024, according to FMC and KPMG, and roughly €17.3bn in 2025 on our roll-forward. The same study forecasts €26bn by 2030.
How fast is second-hand fashion growing in Europe?
FMC and KPMG expect 8.5% a year to 2030. BCG and Vestiaire Collective put global second-hand fashion growth at about 10% a year, three times faster than new fashion.
How big is Vinted?
Vinted's gross merchandise value reached €10.8bn in 2025, up 47%, with revenue of €1.1bn and profit of €62m, according to its results reported in April 2026.
Sources
- Europe's resale apparel market to reach €26bn by 2030, says new report, SGI Europe (reporting FMC/KPMG), April 2025.
- Vinted's revenues top €1bn but profits slide, Tech.eu, 9 April 2026.
- Secondhand fashion and luxury set to reach up to $360 billion by 2030, Boston Consulting Group and Vestiaire Collective, 9 October 2025.
- ThredUp's 14th annual Resale Report reveals new era of structural competition, ThredUp via Business Wire (data by GlobalData), 2 April 2026.
- Online second-hand market in Europe accounts for 21.6 billion, RetailDetail EU, 22 July 2025.
- Europe's secondhand market to grow by £1.7bn in 2025, Retail Gazette (reporting Amazon/CEBR), July 2025.