the decision pattern.TDP.

Vietnam shrimp farming market size 2025

Vietnam exported a record $4.6bn of shrimp in 2025, up 19%, with China and Hong Kong the largest market. Farmed output reached about 1 million tonnes in the first nine months on 711,000 hectares. Here are the VASEP and statistics office figures.

Medium confidenceResearched 2 November 20267 linked sources
Market size 2025
$4.6bn of shrimp exports
Range
$4.5bn–$4.6bn
Forecast
no published 2026 shrimp forecast; VASEP targets $11.5bn for all seafood in 2026
Growth
up 19% year on year

Market size

Vietnam's shrimp exports reached a record about $4.6bn in 2025, up 19% on 2024, according to the Vietnam Association of Seafood Exporters and Producers (VASEP). Shrimp was the largest single seafood export, ahead of pangasius at $2.2bn, within total seafood exports of nearly $11.3bn. Through November the figure was $4.3bn, up 21%, and VASEP said the full year would "surpass $4.5bn and could reach $4.6bn".

Exports are the only published value measure for the industry. On the farm side, the General Statistics Office recorded farmed shrimp output of 998,800 tonnes in the first nine months of 2025, up 6.3%: 719,700 tonnes of whiteleg shrimp and 212,300 tonnes of black tiger shrimp. Brackish-water shrimp ponds covered about 711,000 hectares by August. Full-year 2025 production tonnage had not been published on a page we could fetch.

MeasureFigurePeriodSource
Shrimp export value$4.6bn (+19%)2025VASEP via SeafoodSource
Shrimp export value$4.3bn (+21%)Jan–Nov 2025VASEP via Viet Nam News
Farmed shrimp output998,800 t (+6.3%)Jan–Sep 2025GSO via VASEP
Whiteleg shrimp output719,700 t (+7.1%)Jan–Sep 2025GSO via VASEP
Black tiger shrimp output212,300 t (+3.5%)Jan–Sep 2025GSO via VASEP
Brackish-water shrimp areaabout 711,000 haJan–Aug 2025Fisheries Surveillance Dept via VASEP
Total seafood exports$11.3bn (+12.4%)2025VASEP via SeafoodSource

Who is buying

  • China and Hong Kong became the largest market: $1.2bn in January–November, up 59%, over 28% of shrimp exports. Demand was strongest for processed and premium products, where Vietnam competes with Thailand rather than with low-cost Ecuador and India.
  • CPTPP countries took $1.2bn, up 32%, led by Japan at $535m (up 13%).
  • United States purchases rose only 7% to $754m and fell 7% in November under anti-dumping and countervailing duties.
  • European Union imports rose 21% to $540m, led by Germany, Belgium and the Netherlands.
  • Products. Whiteleg shrimp earned over $2.2bn in the first nine months, about 65% of shrimp export value; lobster was a notable contributor to growth.
  • Farm base. Black tiger shrimp occupies 604,500 hectares but yields 184,100 tonnes (to August), while intensive whiteleg farms on 106,500 hectares produced 617,100 tonnes.

How this estimate was made

  1. The headline is VASEP's full-year 2025 export figure of $4.6bn, as reported by SeafoodSource. It matches VASEP's December projection reported by VnEconomy and Viet Nam News, which give the $4.3bn January–November actual.
  2. The range covers VASEP's own wording: "surpass $4.5bn and could reach $4.6bn".
  3. Export value is quoted in US dollars because VASEP reports it that way; we have not converted to dong.
  4. Production comes from the General Statistics Office (nine months) and the Fisheries Surveillance Department (eight months), both via VASEP. These are volume measures from the former Ministry of Agriculture and Rural Development system and cannot be combined with export value, which includes processing and imported raw shrimp.
  5. There is no published 2026 shrimp export forecast on the pages fetched; VASEP's 2026 target of $11.5bn covers all seafood and expects aquaculture output of 6.25 million tonnes. Confidence is medium because the value figure rests on one industry body, and farm-gate value is unmeasured.

Questions

How much shrimp does Vietnam export?

About $4.6bn in 2025, a record and up 19%, according to VASEP. Shrimp is Vietnam's largest seafood export.

How much shrimp does Vietnam produce?

Farmed output was 998,800 tonnes in the first nine months of 2025, up 6.3% (General Statistics Office), of which 72% was whiteleg shrimp.

Where does Vietnamese shrimp go?

China and Hong Kong ($1.2bn, up 59%) and the CPTPP bloc ($1.2bn) led in January–November 2025, followed by the United States ($754m) and the EU ($540m).

Is the Vietnamese shrimp industry growing?

Exports grew 19% in 2025 and output about 6%. VASEP is more cautious for 2026, citing US tariffs, competition in China and high domestic production costs.

Sources

  1. Vietnam's 2025 seafood exports hit record high, SeafoodSource, undated (January 2026).
  2. Vietnam's shrimp exports projected to hit record $4.6 bln in 2025, VnEconomy, 26 December 2025.
  3. Việt Nam's shrimp exports hit record high, Viet Nam News, 9 December 2025.
  4. Vietnam's shrimp exports hit three-year high, VnEconomy, 27 October 2025.
  5. Aquatic production output reaches over 7.26 million tons, VASEP (General Statistics Office data), 6 November 2025.
  6. Shrimp output in the first eight months of 2025 increases by over 6%, VASEP, 14 October 2025.
  7. Vietnam's January–August farmed shrimp output exceeds 800,000 tons amid challenges, Baird Maritime, 17 October 2025.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.