UK smart meters market size 2026

Great Britain had 42 million smart and advanced meters at end June 2026, 72% of all meters, according to DESNZ. Suppliers installed 2.8 million new meters in 2025 and must offer every remaining home a smart meter by end 2030; lifetime programme costs are put at £20.8bn.

High confidenceResearched 2 November 20265 linked sources
Market size 2026
42 million meters installed (72% of all meters)
Range
41.6 million–42 million smart and advanced meters at end June 2026
Forecast
all remaining domestic premises to be offered a smart meter by end 2030 (government policy); about 57.5 million meters in scope
Growth
2.8 million new meters installed in 2025, down 5.8% on 2024; Q2 2026 domestic installations up 4.3% year on year

Market size

The official count comes from the Department for Energy Security and Net Zero (DESNZ). At the end of June 2026 there were 42 million smart and advanced meters in homes and small businesses in Great Britain, making up 72% of all meters. The published table gives 41.6 million smart or advanced meters out of 57.5 million meters in total, which is the source of the small range above. Of the 40 million smart meters, 92% were working in smart mode and 3.1 million were running as traditional meters.

This is a volume measure, not a revenue figure; there is no official value for the smart metering "market". The closest thing is the government's 2025 Costs and Benefits Report, which puts lifetime costs for meters installed to the end of 2024 at £20.8bn in 2024 prices, against £24.5bn of benefits. Dividing that by the 39 million meters in place at March 2025 gives roughly £530 per meter, our calculation, not a published figure.

MeasureFigurePeriod / source
Smart and advanced meters in operation42 million (72% of all meters)End June 2026, DESNZ
Smart meters in smart mode92%End June 2026, DESNZ
Homes with a smart electricity meter75%End June 2026, DESNZ
Homes with a smart gas meter57%End June 2026, DESNZ
New smart and advanced meters installed2.8 million, down 5.8%Calendar 2025, DESNZ
Large-supplier installations incl. replacements1.1 million (525,000 new, 570,000 replacements)Q2 2026, DESNZ
Lifetime programme cost (meters to end 2024)£20.8bn, 2024 prices2025 Costs and Benefits Report

What is driving it

  • A legal obligation, not consumer demand. The post-2025 policy framework, confirmed in March 2026, requires suppliers to take all reasonable steps to install smart meters in all remaining domestic premises by the end of 2030, with annual deployment plans submitted to Ofgem and binding milestones from 1 January 2027.
  • Replacement is becoming as big as new installation. In Q2 2026 large suppliers fitted 570,000 replacement meters against 525,000 new ones. The framework also requires pre-emptive replacement of assets before 2G and 3G networks are switched off at the end of 2033.
  • New installations are slowing. 2025 saw 2.8 million new installations, 5.8% fewer than in 2024, and the non-domestic segment fell 20%. The remaining 15 million non-smart meters at large suppliers are the harder-to-reach tail.
  • Costs land on bills. The National Audit Office noted in 2023 that suppliers pass installation costs to households through energy bills, and that cost per meter was running above the 2019 plan.

How this estimate was made

  1. The headline is the DESNZ quarterly statistical bulletin for June 2026, published 27 August 2026, the official count of meters in operation.
  2. The range comes from the same bulletin: the rounded headline (42 million) against the detailed table (41,557,000), which mixes large-supplier data at June 2026 with small-supplier data at December 2025.
  3. Installation flows come from the Q4 2025 report (calendar-year totals, new installations only) and the Q2 2026 bulletin (quarterly totals including replacements).
  4. The £530 per meter figure is our calculation: £20.8bn of lifetime costs divided by 39 million meters. It is indicative only, because the cost base covers meters installed to end 2024 and includes operating costs to 2034.
  5. There is no published revenue series for meter manufacturers or installers in Great Britain, so we do not state a £ market value for the headline.

Questions

How many smart meters are there in the UK?

Great Britain had 42 million smart and advanced meters at the end of June 2026, 72% of all meters, according to DESNZ. The statistics cover Great Britain only.

How much does the UK smart meter rollout cost?

The government's 2025 Costs and Benefits Report puts lifetime costs for meters installed to the end of 2024 at £20.8bn in 2024 prices, with £24.5bn of benefits. The NAO's 2023 review quoted the earlier 2019 forecast of £13.5bn for 2013 to 2034 and warned costs per meter were higher than planned.

How many smart meters are installed each year?

Suppliers installed 2.8 million new smart and advanced meters in 2025, 5.8% fewer than in 2024. Including replacements, large suppliers fitted about 1.1 million meters in Q2 2026 alone.

When will the smart meter rollout finish?

The post-2025 framework requires suppliers to take all reasonable steps to install smart meters in all remaining domestic premises by the end of 2030. The earlier Targets Framework ended in 2025.

Sources

  1. Smart meters in Great Britain, quarterly update June 2026: statistical bulletin, Department for Energy Security and Net Zero, 27 August 2026.
  2. Smart Meters Statistics Report, Q4 2025, Department for Energy Security and Net Zero, 19 March 2026.
  3. Smart Metering 2025 Costs and Benefits Report, Department for Energy Security and Net Zero (deposited paper), 2025.
  4. Smart metering policy framework post 2025: government response, Department for Energy Security and Net Zero, 10 March 2026.
  5. Update on the rollout of smart meters, National Audit Office, 14 June 2023.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.