Market size
The best measure of the solar inverter market is shipped capacity. Wood Mackenzie counted 589 GWac of PV inverter shipments in 2024, up 10% on 2023. Asia-Pacific took 69% of that capacity and China alone 330 GWac, up 14%, while Europe saw a sharp double-digit fall in residential and commercial shipments and the US a single-digit fall.
No published 2025 total is available to us yet. Sungrow reported 198 GW of inverter shipments in 2025 and an estimated 30% global share, which implies a market of about 660 GW (our calculation). That is consistent with the IEA PVPS count of 698 GW of PV installed in 2025, up 16%.
In value terms, the only full-market figure is from a paid report: MarketsandMarkets puts the solar inverter market at $12.7bn in 2025, rising to $23.7bn by 2030.
| Measure | Figure | Period | Source |
|---|---|---|---|
| Global PV inverter shipments | 589 GWac, +10% | 2024 | Wood Mackenzie |
| China inverter shipments | 330 GWac, +14% | 2024 | Wood Mackenzie |
| Huawei / Sungrow shipments | 176 GWac / 148 GWac | 2024 | Wood Mackenzie |
| Global PV installations | 698 GW, +16% | 2025 | IEA PVPS |
| Sungrow inverter shipments | 198 GW, about 30% share | 2025 | Sungrow, via pv magazine |
| Market value | $12.7bn | 2025 | MarketsandMarkets |
Leading players
- Two vendors hold more than half. Huawei (176 GWac) and Sungrow (148 GWac) shipped 55% of 2024 volume; no other vendor had more than 5%. Ginlong Solis and Growatt ranked third and fourth, and nine of the top ten are headquartered in China.
- Sungrow's storage now outsells its inverters. Its 2025 revenue was CNY 89.18bn, up 14.55%, with PV inverters at CNY 31.14bn and energy storage at CNY 37.29bn (up 49%).
- SMA shows the Western squeeze. The German maker sold 19.9 GW of inverters in 2025 (19.5 GW in 2024) for €1,516m of revenue, down 0.9%. Utility-scale sales grew to €1,268.8m, but Home and Business Solutions fell from €354.1m to €247.2m and the group lost €181.1m.
- Wood Mackenzie's H1 2025 ranking again placed Huawei first and Sungrow second, and in December 2025 the firm said it expects the inverter market to shrink over the next two years.
Where demand is
- China installed about 415 GW in 2025, roughly 60% of the world total, and reached about 1,464 GW cumulative (IEA PVPS).
- The next markets were the EU (65.7 GW), India (55.9 GW), the US (43.2 GW), Germany (16.9 GW), Pakistan (15.8 GW) and Brazil (13.8 GW).
- Growth is slowing. Global additions grew 16% in 2025 after about 30% in 2024.
How this estimate was made
- The headline is Wood Mackenzie's 589 GWac shipment count for 2024, the latest full-year industry figure we could read. It measures AC capacity shipped by manufacturers, not installed capacity.
- The upper end of the range is our calculation: Sungrow's 198 GW of 2025 shipments divided by its stated 30% share gives about 660 GW. This depends on Sungrow's own share estimate and is not a published total.
- The IEA PVPS installation figure (698 GW DC in 2025) is a different measure. Installations are counted in DC watts and inverters in AC watts, so the two are not directly comparable; we use it as a demand cross-check.
- The value figure comes from one paid report (MarketsandMarkets, $12.7bn in 2025, 13.2% a year to 2030). Its growth rate conflicts with Wood Mackenzie's expectation of shrinking shipments and with falling inverter prices, so we do not headline it.
- Confidence is medium: the volume figure comes from one specialist consultancy, and the 2025 total is inferred.
Questions
How big is the global solar inverter market?
Wood Mackenzie counted 589 GWac of PV inverter shipments in 2024, up 10%. For 2025, Sungrow's 198 GW at a stated 30% share implies about 660 GW (our calculation). In value, MarketsandMarkets estimates $12.7bn for 2025.
Who are the largest solar inverter manufacturers?
Huawei shipped 176 GWac and Sungrow 148 GWac in 2024, 55% of the market between them, according to Wood Mackenzie. Ginlong Solis and Growatt followed. Sungrow shipped 198 GW in 2025.
Is the solar inverter market growing?
Shipments grew 10% in 2024 and global PV installations grew 16% to 698 GW in 2025 (IEA PVPS). But Wood Mackenzie said in December 2025 that it expects the inverter market to shrink over the next two years, and SMA's revenue fell slightly in 2025.
How much solar was installed worldwide in 2025?
About 698 GW, taking cumulative capacity to nearly 3 TW, according to the IEA PVPS Snapshot 2026. China installed about 415 GW of that.
Sources
- Global PV inverter shipments grew by 10% in 2024 to 589 GWac, Wood Mackenzie, 10 July 2025.
- WoodMac: Huawei and Sungrow held largest inverter market share in 1st half of 2025, Solar Power World, 5 January 2026.
- Chinese PV Industry Brief: Sungrow storage overtakes inverters in 2025, pv magazine, 3 April 2026.
- SMA Group: figures 2025 and guidance 2026, SMA Solar Technology AG, 26 March 2026.
- Snapshot of Global PV Markets 2026 fact sheet, IEA PVPS, May 2026.
- Solar Inverter Market, MarketsandMarkets, April 2026.