Market size
The most solid measure of the US module market is volume. SEIA and Wood Mackenzie report that the US installed 43.2 GWdc of solar in 2025, down 14% on 2024, with utility-scale projects taking 34.7 GWdc. Solar was the largest source of new generating capacity for the fifth year running.
No official body publishes a current dollar value for modules. EIA's module shipments survey, which did, has been suspended; its last release (December 2024) runs only to September 2024. We therefore multiply installed volume by module prices. Anza's pricing data, reported by Mercom, put the US median module price at $0.25/W in January 2025 and about $0.28/W in November 2025. At $0.28/W, 43.2 GWdc is worth about $12.1bn (our calculation). The range of $10.8bn to $15.6bn runs from the January 2025 median ($0.25/W) to the price of US-assembled modules with imported cells ($0.36/W).
| Measure | Value | Period | Source |
|---|---|---|---|
| Solar installed | 43.2 GWdc | 2025 | SEIA/Wood Mackenzie |
| Utility-scale share of that | 34.7 GWdc | 2025 | SEIA/Wood Mackenzie |
| Module spending (our calculation) | $12.1bn ($10.8bn–$15.6bn) | 2025 | Volume × Anza prices |
| Module shipments, value | $11.3bn (33.2 GW, $0.34/W) | 2023 | EIA monthly rows, our sum |
| Domestic module factory capacity | 65.5 GW | End 2025 | SEIA/Wood Mackenzie |
Market structure
- Utility-scale dominates. Utility projects took 34.7 GWdc of the 43.2 GWdc. Residential was 4.6 GWdc (down 2%), commercial 2.3 GWdc (up 6%) and community solar 1.4 GWdc (down 25%).
- Prices depend on origin. In November 2025, imported modules sold for a median of $0.265/W, US modules with imported cells for $0.36/W, and US modules with US cells for $0.42/W. TOPCon was $0.285/W and mono PERC $0.275/W.
- Domestic capacity is growing fast. Module factory capacity reached 65.5 GW at the end of 2025, up from 42.5 GW a year earlier, which is more than the US installed that year. A wafer plant opened in the third quarter of 2025.
- One large domestic maker. First Solar reported 2025 net sales of $5.2bn, up from $4.2bn, and guides to 17.0–18.2 GW sold in 2026. That revenue includes some sales outside the US.
What drives it
- Policy. The residential tax credit ended in 2025, and SEIA expects residential installs to fall 19% in 2026. Final Foreign Entity of Concern guidance and pending trade cases will shape which modules qualify for credits and what they cost.
- Steady utility demand. The base case has utility-scale builds averaging about 35 GWdc a year through 2030.
How this estimate was made
- Volume comes from the SEIA/Wood Mackenzie 2025 Year in Review, the industry's standard installation count.
- We multiplied 43.2 GWdc by $0.28/W, Anza's November 2025 median: 43.2 × 0.28 = $12.1bn. The low end uses $0.25/W ($10.8bn) and the high end $0.36/W ($15.6bn). These are our calculations, not published figures.
- As a cross-check, we summed EIA's monthly 2023 shipment rows: 33.2 GW worth $11.3bn, an average of $0.34/W. EIA notes those rows cover a subset of manufacturers.
- Installed capacity is not the same as modules bought in a year, because of stockpiling around tariff dates, and DC capacity is not the same as shipments. Treat the dollar figure as an order of magnitude.
Questions
How big is the US solar module market?
The US installed 43.2 GWdc of solar in 2025, according to SEIA and Wood Mackenzie. At 2025 median module prices, that is about $12.1bn of modules (our calculation), in a range of $10.8bn to $15.6bn.
How much do solar modules cost in the US?
Anza put the median US module price at about $0.28/W in November 2025, up from $0.25/W in January. US-made modules with US cells cost $0.42/W.
How much solar module manufacturing capacity does the US have?
SEIA and Wood Mackenzie count 65.5 GW of module factory capacity at the end of 2025, up from 42.5 GW at the end of 2024.
Is the US solar market growing?
Installations fell 14% in 2025. The base case expects about 490 GWdc to be added from 2026 to 2036, an average of about 44 GWdc a year.
Sources
- Solar Market Insight Report 2025 Year in Review, SEIA and Wood Mackenzie, March 2026.
- 2025 year in review: SEIA and Wood Mackenzie, Solar Power World, 10 March 2026.
- US median solar module prices rose 14% between January and November, Mercom India (Anza data), 16 December 2025.
- Table 3: Photovoltaic module shipments, US Energy Information Administration, 12 December 2024.
- Monthly Solar Photovoltaic Module Shipments Report, US Energy Information Administration, 12 December 2024 (now suspended).
- First Solar announces fourth quarter and full year 2025 financial results, First Solar via Business Wire, 24 February 2026.