the decision pattern.TDP.

Europe specialty chemicals market size 2024

Specialty chemicals sales in the EU27 were €177bn in 2023, 27% of a €655bn chemical industry (Cefic). With total sales down to about €635bn in 2024, our estimate for specialties is about €171bn. Output fell again in 2025 and plants run at 74% of capacity.

Medium confidenceResearched 2 November 20266 linked sources
Market size 2024
€171bn
Range
€165bn–€177bn
Forecast
€170bn–€190bn by 2030 (our own scenario, not a published forecast)
Growth
flat to 2% a year (2024–2030, our scenario); EU chemical output fell 2.4% in 2025

Market size

The European chemical trade body Cefic splits EU27 chemical sales into five segments. For 2023, the latest year with a published split, specialty chemicals were €177bn, or 27% of total sales of €655bn, making specialties the largest segment, just ahead of petrochemicals (€170bn), polymers (€118bn), consumer chemicals (€98bn) and basic inorganics (€92bn). The figures appear in Deloitte's 2026 industry review and, as shares, in the Advancy study commissioned by Cefic.

Cefic's 2025 Facts and Figures report says total EU27 turnover was "around €635bn" in 2024, a fall of about 3% (our calculation). No 2024 segment split is published, so our desk estimate applies the 2023 share of 27% to the 2024 total, giving about €171bn for 2024. The range of €165bn to €177bn allows for the specialty share moving a point either way. Note that Cefic covers the 27 EU member states only: Switzerland, the UK and Norway, all home to large specialty producers, are outside the figures.

Segment (EU27)2023 salesShare of total
Specialty chemicals€177bn27%
Petrochemicals€170bn26%
Polymers€118bn18%
Consumer chemicals€98bn15%
Basic inorganics€92bn14%
Total EU27 chemicals€655bn (2023); about €635bn (2024)100%

Why the market is under pressure

  • Volumes keep falling. Cefic's Chemical Trends Report shows EU27 chemical production fell 2.4% in 2025 while global output rose 3.8%; in the first half of 2026 it fell a further 1.6%. Capacity utilisation was 74.4% in the second quarter of 2026 against a long-run average of 81.3%.
  • Specialty exports are slipping. Extra-EU chemical exports fell €7.2bn (6.3%) in the first half of 2026, of which €1.5bn was specialty chemicals; the US accounted for about 93% of the overall decline. Specialty imports were broadly stable.
  • Europe's global share has halved. Cefic puts the EU's share of world chemical sales at 13% in 2024, down from 21% in 2009, while China's share is around 45%.
  • Margins are holding better than volumes. Deloitte reports gross margins for listed European specialty companies steady at 30%–33% from 2020 to mid-2024. Evonik's 2025 sales fell 7% to €14.1bn but it met its €1.9bn adjusted EBITDA target; Clariant's sales were flat in local currency at CHF 3.915bn with the EBITDA margin up to 17.8%.
  • Germany is the centre. Advancy gives Germany €218bn of 2023 chemical sales, France €92bn, Italy €65bn, the Netherlands €60bn and Spain €54bn.

How this estimate was made

  1. The 2023 figure of €177bn comes from Cefic data reproduced by Deloitte, and matches the 27% specialty share in the Advancy study multiplied by Cefic's €655bn total (27% of €655bn is €177bn).
  2. For 2024 we multiplied Cefic's "around €635bn" total by the same 27% share: €171bn. This is our own calculation; Cefic has not yet published a 2024 segment split.
  3. The range of €165bn to €177bn corresponds to a specialty share of 26% to 28% of €635bn, reflecting that specialty volumes have held up better than petrochemicals.
  4. The 2030 range is our own scenario, not a published forecast: holding sales flat gives about €171bn, and 2% a year nominal growth gives about €192bn, rounded to €170bn–€190bn.
  5. Missing: a Europe-wide figure that includes Switzerland and the UK, and a 2025 sales total (Cefic's trends report gives volumes and prices but no full-year 2025 turnover).

Questions

How big is the specialty chemicals market in Europe?

Specialty chemicals sales in the EU27 were €177bn in 2023, 27% of the €655bn chemical industry (Cefic). Our estimate for 2024 is about €171bn, reflecting the fall in total EU27 chemical sales to around €635bn.

What share of European chemical sales is specialty chemicals?

About 27% in 2023, making it the largest of Cefic's five segments, ahead of petrochemicals at 26%. Consumer chemicals add a further 15%.

Is the European chemical industry growing?

No. EU27 chemical production fell 2.4% in 2025 and a further 1.6% in the first half of 2026, with plants running at about 74% of capacity. Sales fell from €655bn in 2023 to around €635bn in 2024.

Who are the largest European specialty chemical companies?

Evonik reported €14.1bn of 2025 sales and Clariant CHF 3.915bn; both report flat or falling sales but stable or rising margins. Germany accounts for about a third of European chemical sales and added value.

Sources

  1. Facts and Figures of the European Chemical Industry 2025: Profile, Cefic, updated 11 December 2025.
  2. The Competitiveness of the European Chemical Industry, Advancy for Cefic, January 2025.
  3. Future of the European Chemical Industry, issue 03/2026, Deloitte, 2026.
  4. Chemical Trends Report Q2 2026, Cefic, August 2026.
  5. Evonik meets 2025 guidance and confirms 2026 outlook (Q4 reporting 2025), Evonik Industries, 4 March 2026.
  6. Clariant delivers third year of strong EBITDA margin improvement, Clariant, 26 February 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.