the decision pattern.TDP.

India steel pipes and tubes market size 2025

India used about 14.6 million tonnes of steel pipes in 2025, and structural steel tubes alone were about 10 million tonnes in FY26. APL Apollo leads structural tubes with a 65% share. Here are the volumes, the leading players and the forecast to 2034.

Medium confidenceResearched 2 November 20265 linked sources
Market size 2025
14.6 million tonnes
Range
10.0–14.6 million tonnes
Forecast
28.7 million tonnes by 2034
Growth
7.4% a year (2026–2034)

Market size

IMARC Group puts India's steel pipes market at 14.6 million tonnes in 2025 and expects it to reach 28.7 million tonnes by 2034, growing 7.41% a year. Structural steel tubes, the hollow sections used in buildings, sheds, fencing and solar structures, were about 10.0 million tonnes in FY26 according to APL Apollo's investor presentation. We show the market as a range of 10.0 to 14.6 million tonnes: the low end is structural tubes only, the high end is all steel pipes.

MeasureValuePeriod
All steel pipes14.6 million tonnes2025
All steel pipes, forecast28.7 million tonnes2034
Structural steel tubes9.0 million tonnesFY24
Structural steel tubes10.0 million tonnesFY26
Structural steel tubes, forecast18.3 million tonnesFY31
Steel tubes, value$7.57bn2025

The value figure comes from a separate IMARC report on steel tubes, with a different scope from the volume figure, so the two should not be divided to get a price per tonne.

Leading players

  • APL Apollo sold 3.49 million tonnes in FY26, up from 3.16 million tonnes in FY25 and 2.62 million tonnes in FY24. It reports a 65% share of structural steel tubes in FY26, up from 55% in its October 2025 presentation, with 5 million tonnes of capacity across 11 plants.
  • The next six structural tube makers each hold between 2% and 9%, according to the same presentation, which does not name them.
  • In line pipe for oil, gas and water, Welspun Corp and Tata Steel are active; IMARC notes their joint development of welded pipes for hydrogen transport in 2024.

What drives demand

  • Housing was 64% of APL Apollo's FY26 revenue, commercial building 19% and infrastructure 13%.
  • Steel substitution. Structural tubes were about 6% of India's steel use in FY26, and APL Apollo expects that share to rise as tubes replace angles and channels in construction.
  • Water and gas networks drive demand for large-diameter pipe.

How this estimate was made

  1. The headline volume is IMARC's 2025 estimate for all steel pipes, published in October 2026.
  2. The low end of the range is APL Apollo's FY26 estimate for structural steel tubes, one segment of the pipe market.
  3. Player volumes come from APL Apollo's own presentations. Its share figures do not state the denominator, and its October 2025 deck labels the 55% share as both FY25 and H1 FY26.
  4. Recent growth: APL Apollo's FY26 volume grew 10.5% (our calculation), while its April–June 2026 quarter fell 6.2% on a year earlier.

Questions

How big is the steel pipe market in India?

India's steel pipe market was about 14.6 million tonnes in 2025, according to IMARC. Structural steel tubes alone were about 10 million tonnes in FY26.

Who is the largest steel tube maker in India?

APL Apollo is the largest structural steel tube maker, with 3.49 million tonnes of sales and a reported 65% share in FY26.

How fast is the Indian steel pipe market growing?

IMARC expects 7.41% a year to reach 28.7 million tonnes by 2034. APL Apollo expects structural tubes to grow from 10.0 to 18.3 million tonnes by FY31.

Sources

  1. India steel pipes market size, share, trends and forecast 2026–2034, IMARC Group, updated 15 October 2026.
  2. India steel tubes market size, share and forecast 2026–2034, IMARC Group, updated 29 September 2026.
  3. Investor presentation Q1 FY27, APL Apollo Tubes, August 2026.
  4. Investor presentation, October 2025, APL Apollo Tubes, October 2025.
  5. APL Apollo fires on all cylinders; what's next for the stock?, Business Standard, 30 October 2025.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.