Market size
Purpose-built student accommodation (PBSA) is measured two ways: by the capital invested each year and by the value of the stock. On the first measure, Knight Frank counts £4.3bn of PBSA investment in 2025, up 10% on 2024 across 79 deals, just below the ten-year average of £4.5bn. Savills put 2024 at £3.5bn, up 13% on 2023, against a five-year average of £4.9bn, so the two firms' series are consistent.
On the second measure, the only published figure we found is Knight Frank's 2023 estimate that the sector was worth £85.8bn, with a forecast of £104bn by 2028. That is now three years old and predates the softer 2025/26 and 2026/27 lettings cycles, so treat it as an order of magnitude.
| Measure | Figure | Period | Source |
|---|---|---|---|
| PBSA investment | £3.5bn (+13%) | 2024 | Savills |
| PBSA investment | £4.3bn (+10%), 79 deals | 2025 | Knight Frank |
| PBSA investment, year to date | £2.7bn | January–September 2026 | Knight Frank outlook 2026/27 |
| New beds delivered | 19,600 across 64 schemes; 50,250 under construction | 2025 | Knight Frank |
| New beds delivered | 18,200 (net increase 10,000) | 2024/25 | Cushman & Wakefield |
| Rental growth, all room types | 2.3% (2025/26); 1.5% (2026/27) | Knight Frank rental index | |
| Sector value | £85.8bn; £104bn by 2028 | 2023 | Knight Frank |
| UK higher education students | 2,863,180 (down 1%) | 2024/25 | HESA |
What drives it
- Student numbers have stopped growing. HESA counted 2,863,180 students at UK providers in 2024/25, down 37,060 on the year, with international students down 6% to 685,565. UCAS acceptances for the 2025 cycle were up 2.3%, but the HEPI analysis notes that students intending to live at home rose 4.4%, so accommodation demand grew only 0.2%.
- Supply is slower than before Covid. Cushman & Wakefield counts 88,000 beds delivered in the last five years against 158,000 in the five before, an average of 17,600 a year instead of 31,600. Half of 2025/26 deliveries were in London (3,775), Nottingham (2,593) and Leeds (1,979). Only about 20% of the pipeline is under construction.
- Affordability is the constraint. A record 23% of PBSA beds in England cost more than the maximum maintenance loan, and new schemes need a blended rent of about £265 a week to be viable. Postgraduate numbers fell more than 17% in two years, and Sheffield's rents fell 5.5%.
- The students-to-bed ratio is still above two nationally, according to Cushman & Wakefield, but it is falling in half of the 14 largest markets as supply arrives and demand softens.
Leading operator
- Unite Students, the largest listed owner, valued its portfolio at £6,601m (its share) at 31 December 2025, with a gross valuation of £9,160m including fund partners. Occupancy for 2025/26 was 95.2% (97.5% a year earlier) and like-for-like rental growth 4.0% (8.2%). It guided to 2% to 3% rental growth and 93% to 96% occupancy for 2026/27, with 37,660 beds, 59% of its total, let to universities under nomination agreements. It bought Empiric's 7,700 beds and has a 5,964-bed development pipeline.
- Yields softened by 25 basis points over the first nine months of 2025 according to Savills (cited by HEPI), and StuRents put sector occupancy at 85.4% for 2025/26.
How this estimate was made
- The headline is Knight Frank's 2025 investment volume of £4.3bn, published in its Q4 2025 market update. We chose annual investment because it is the measure both Knight Frank and Savills publish each year with a stated method.
- The range runs from Savills' 2024 figure (£3.5bn) to Knight Frank's 2025 figure (£4.3bn).
- The sector value and the 2028 forecast come from a Knight Frank release reported by PBSA News in late 2023. We have not rolled it forward because rents have since slowed to 2.3% and 1.5% a year and yields have softened.
- Bed deliveries from Knight Frank (19,600 in calendar 2025) and Cushman & Wakefield (18,200 in academic 2024/25) differ because they count different periods.
- Missing: a current total UK PBSA bed count and an up-to-date sector valuation. Neither appeared in the pages we could read, so confidence is medium rather than high.
Questions
How much is invested in UK student accommodation each year?
£4.3bn in 2025 across 79 deals, up 10% on 2024, according to Knight Frank. Savills recorded £3.5bn in 2024. The ten-year average is about £4.5bn.
How many student beds are being built in the UK?
Knight Frank counts 19,600 new PBSA beds delivered in 2025 across 64 schemes, with 50,250 under construction. Cushman & Wakefield says deliveries have averaged 17,600 a year over five years, down from 31,600.
Are UK student rents still rising?
Slowly. Knight Frank's rental index shows 2.3% growth for 2025/26 and 1.5% for 2026/27. Unite Students reported 4.0% like-for-like growth for 2025/26 and guided to 2% to 3% for 2026/27, down from 8.2% in 2024/25.
How many students are there in the UK?
2,863,180 in 2024/25 according to HESA, down 1% on the previous year, including 685,565 international students.
Sources
- Investors committed £4.3 billion to the PBSA market in 2025, up 10% year on year, Knight Frank, 16 February 2026.
- Investing through the noise: UK Student Accommodation Outlook 2026/27, Knight Frank, 2026.
- Cushman & Wakefield warns of affordability gap in PBSA sector, Property Reporter, 14 October 2025.
- New statistics for 2024/25 academic year show overall decrease in student numbers, AccommodationForStudents (reporting HESA data of 27 January 2026), 30 January 2026.
- Unite Group results for the year ended 31 December 2025, Unite Group RNS via Stockopedia, 24 February 2026.
- UK PBSA investment hits £3.5bn in 2024, according to Savills, Savills, 16 January 2025.
- What's happening with the UK's student accommodation?, HEPI, 11 April 2026.
- Value of PBSA sector to grow to £104bn by 2028, Knight Frank finds, PBSA News, late 2023 (Q3 2023 data).