Market size
Redseer estimates India's test preparation market at about $14.8bn in FY26, growing 12% to 15% a year to $23bn to $26bn by FY30. The engineering (JEE) and medical (NEET) entrance exams together account for nearly 70% of undergraduate entrance preparation.
IMARC Group publishes a far smaller figure, $311.8m for 2025, growing 26.88% a year to 2034. The two cannot both describe the same market; IMARC's appears to measure a much narrower slice, so we use Redseer's as the headline and do not combine them.
| Measure | Value | Period |
|---|---|---|
| Test preparation market (Redseer) | about $14.8bn | FY26 |
| Test preparation market forecast (Redseer) | $23bn–$26bn | FY30 |
| JEE and NEET share of UG entrance preparation | nearly 70% | FY26 |
| PhysicsWallah revenue from operations | ₹3,899.5 crore, up 35% | FY26 |
| PhysicsWallah paid users | 5.34 million | End FY26 |
Market structure
- Results sell. Redseer's survey found 57% of offline students ranked faculty quality among their top three reasons for choosing a coaching centre, and 44% chose past results. Among top-1,000 rankers the figures were 59% and 51%.
- The odds are long. Only about 1% of JEE candidates reach an IIT, and about 3% of NEET candidates reach a preferred government medical seat, which keeps families paying for preparation.
- Online-first companies have scaled reach. PhysicsWallah, now listed, grew revenue 35% in FY26 and nearly broke even, with a full-year net loss of ₹24.2 crore. Redseer notes that online platforms widened reach but produced fewer top results than established offline brands.
- Hybrid and regional languages. PhysicsWallah launched AI-based NEET and JEE courses in five regional languages in 2025.
How this estimate was made
- The headline and forecast come from Redseer's August 2026 report, also reported by PTI in Outlook Business. These are one estimate, not two independent ones, so the range field shows a single figure.
- We list IMARC's figure for transparency but do not use it, because it is about 47 times smaller and its scope is not stated on the public page.
- PhysicsWallah's FY26 figures come from its results as reported by Inc42, Kotak Neo and Multibagg. Its revenue alone is about 3% of the Redseer market (our calculation at roughly ₹85 to the dollar), which shows how fragmented the market is.
Questions
How big is the coaching industry in India?
India's test preparation market is about $14.8bn in FY26, according to Redseer, and is expected to reach $23bn to $26bn by FY30.
Which exams drive test preparation in India?
JEE and NEET, the engineering and medical entrance exams, account for nearly 70% of undergraduate entrance preparation.
What is PhysicsWallah's revenue?
PhysicsWallah reported revenue from operations of ₹3,899.5 crore in FY26, up 35% on FY25, with a net loss of ₹24.2 crore.
Sources
- Outcome is king: India's UG test preparation market rewards credibility over scale, Redseer Strategy Consultants, 13 August 2026.
- India's entrance test preparation market to reach $23–26 bn by FY30, Outlook Business (PTI), 14 August 2026.
- India test preparation market, IMARC Group, updated 3 July 2026.
- PhysicsWallah Q4: loss declines 76% YoY, revenue up 51%, Inc42, 27 May 2026.
- PhysicsWallah Q4 FY26 results, Kotak Neo, 28 May 2026.
- PhysicsWallah FY26: growth stays strong as profitability inches closer, Multibagg, 26 May 2026.