Market size
Two research firms publish recent figures for the global tower crane market, and they disagree. IMARC Group puts it at $8.0bn in 2025, growing 4.2% a year to $11.7bn by 2034. Global Market Insights (GMI) puts it at $5.2bn in 2025, growing 5.6% a year to $8.9bn by 2035. The midpoint of the two is about $6.6bn (our calculation).
The gap is 54%, which is why confidence is low. Neither firm publishes its full method, so we cannot tell whether the gap comes from scope (for example parts, used cranes or rental) or from how Chinese sales are valued. A third firm's published figures were internally inconsistent, so we left it out.
| Measure | Value | Period | Source |
|---|---|---|---|
| Tower crane market | $8.0bn | 2025 | IMARC Group |
| Tower crane market | $5.2bn | 2025 | GMI |
| Asia Pacific share | 45% ($2.3bn) | 2025 | GMI |
| Hammerhead cranes share | 39% | 2025 | GMI |
| Liebherr tower crane revenue | €406m (up 28.9%) | 2025 | Liebherr |
| Top 20 crane makers, all crane types | $32.7bn (down 2.7%) | mostly 2024 | ICM20 |
Market structure and demand
- Asia Pacific is the largest region. GMI puts it at 45% of the market in 2025. Building and construction accounts for 51% of demand, and hammerhead (top-slewing) cranes for 39% of value.
- Europe recovered in 2025. Liebherr's tower crane revenue rose 28.9% to €406m, with 60.6% coming from the EU. Demand for new machines rose in Germany, Italy and the Benelux countries. Manitowoc, which owns Potain, said its "optimism in Europe continues to grow" and reported group sales of $2.24bn, up 2.9%, with fourth-quarter orders up 55.8%.
- The US was weak. Liebherr reported a substantial fall in US tower crane volumes because of sluggish construction; North America was only 3.3% of its segment revenue.
- China is still in a downturn. The ICM20 ranking of the 20 largest crane makers fell 2.7% to $32.7bn, mostly 2024 sales, as the collapse of the Chinese market continued. Zoomlion's crane-maker revenue fell 23% in that ranking. In 2025 Zoomlion's group revenue rose 14.58% to RMB 52.1bn, with 58.56% earned outside China; its combined exports of concrete machinery, mobile cranes and construction hoisting machinery rose more than 20%.
- Large projects move the numbers. A single project using 710 Liebherr HC-L cranes in the Bahamas drove a strong rise in its Central and South American revenue.
How this estimate was made
- We found two 2025 estimates from research publishers, IMARC ($8.0bn) and GMI ($5.2bn), and used them as the range.
- The headline is the midpoint: ($8.0bn + $5.2bn) ÷ 2 = $6.6bn (our calculation). It is not a published figure.
- We checked direction against company filings. Liebherr's €406m is a single maker's revenue, so it cannot size the market, but its rise matches the European recovery described by Manitowoc.
- Missing: an industry-body measure of global tower crane sales by value or units. The main sources, such as Off-Highway Research, are paywalled.
Questions
How big is the global tower crane market?
Published estimates for 2025 range from $5.2bn (GMI) to $8.0bn (IMARC Group). The midpoint is about $6.6bn.
How fast is the tower crane market growing?
IMARC forecasts 4.2% a year to $11.7bn by 2034, and GMI 5.6% a year to $8.9bn by 2035.
Which region buys the most tower cranes?
Asia Pacific, with 45% of the market in 2025 according to GMI. For Liebherr, a leading European maker, the EU supplied 60.6% of tower crane revenue in 2025.
Who are the main tower crane manufacturers?
Liebherr, Manitowoc (which owns Potain) and the Chinese groups Zoomlion and XCMG are among the main makers. Liebherr's tower crane segment earned €406m in 2025.
Sources
- Global tower crane market report, IMARC Group, 12 February 2026.
- Tower crane market opportunity, growth drivers (GMI), Global Market Insights via GII, 16 June 2026.
- Tower cranes – Annual Report 2025, Liebherr, 2026 (undated).
- The Manitowoc Company reports fourth quarter and full year 2025 financial results, Business Wire, 6 February 2026.
- Down and changing: ICM20 crane manufacturer ranking, Construction Briefing, 3 December 2025.
- Zoomlion reports 2025 results with international revenue approaching 60% of total, Zoomlion via Kyodo News PR Wire, 2 April 2026.