the decision pattern.TDP.

UK tutoring services market size 2025

UK private tutoring is worth roughly £3.8bn a year, our rough roll-forward of the Sutton Trust's 2016 estimate of up to £2bn using today's tutor rates. 29% of secondary pupils in England and Wales have had private tuition, and 45% in London.

Indicative estimateResearched 2 November 20265 linked sources
Market size 2025
£3.8bn
Range
£3.2bn–£4.3bn (our roll-forward of the Sutton Trust's 2016 estimate of up to £2bn)
Forecast
No published forecast found
Growth
Share of secondary pupils ever tutored rose from 25% (2016) to 29% (2025)

Market size

The only published estimate of the British private tuition market comes from the Sutton Trust, which in 2016 valued it at up to £2bn a year. It multiplied pupils tutored, hours and price. At the time tutors charged about £24 an hour (£27 in London), and about one in ten state-educated 11 to 16 year olds in England and Wales, around 280,000 pupils, had been tutored in the past year.

Prices and participation have both risen since. Tutoring platform TutorCruncher puts the typical 2026 rate at about £35 to £40 an hour, and the Sutton Trust's 2025 survey found 11% of secondary pupils tutored in the current year and 13% in the previous year. Applying those changes to the 2016 figure gives a rough range of £3.2bn to £4.3bn, with a midpoint of about £3.8bn (our calculation, explained below). This is a desk estimate, not a measurement.

MeasureValuePeriodSource
Private tuition marketup to £2bn2016Sutton Trust
Average tutor rate£24 an hour2016Sutton Trust
Typical tutor rate£35–£40 an hour2026TutorCruncher
Secondary pupils ever tutored29%2025Sutton Trust / Ipsos
National Tutoring Programme courses started1.5 million2023/24Department for Education
Private tuition marketabout £3.8bn2025Our calculation

Who is buying

  • Steady growth in take-up. 29% of state secondary pupils in England and Wales have had private tuition at some point, up from 27% in 2019 and 18% in 2005.
  • London leads. 45% of London pupils have been tutored, against 27% in the rest of England and 24% in Wales.
  • Gap between rich and poor. 30% of the best-off pupils have been tutored against 23% of the worst-off.
  • Price varies by level. TutorCruncher reports £30 to £55 an hour for GCSE and £35 to £70 for A level.
  • State-funded tutoring has shrunk. The National Tutoring Programme started 6.17 million courses between November 2020 and August 2024, including 1.5 million in its final year, 2023/24, when the subsidy fell to 50%. In 2025, 20% of pupils had tuition organised by their school, down from 22% in 2023, and 58% of schools had cut their tutoring offer.

How this estimate was made

  1. We start from the Sutton Trust's 2016 figure of up to £2bn, the only published market value we could find. It is an upper estimate.
  2. Price: we scale by the rise in hourly rates from £24 (2016) to £35–£40 (2026), a factor of 1.46 to 1.67.
  3. Participation: we scale by the rise in pupils tutored in a year, from about 10% in 2016 to 11–13% in 2024–2025, a factor of 1.1 to 1.3.
  4. Low: £2bn × 1.46 × 1.1 = £3.2bn. High: £2bn × 1.67 × 1.3 = £4.3bn. We publish the midpoint, about £3.8bn. This assumes hours per pupil are unchanged and ignores changes in pupil numbers; both are unmeasured.
  5. TutorCruncher's rates are not survey-based and the 2016 base is an upper figure, so confidence is low.

Questions

How big is the UK tutoring market?

Roughly £3.8bn (our calculation), rolling forward the Sutton Trust's 2016 estimate of up to £2bn.

How many children have private tutors in the UK?

29% of state secondary pupils in England and Wales have had private tuition at some point, and 11% were tutored during 2025, according to the Sutton Trust's survey with Ipsos.

How much does a private tutor cost in the UK?

Most tutors charge £30 to £50 an hour, with a typical rate of about £35 to £40. London rates are about £50 to £65.

What happened to the National Tutoring Programme?

It ended after 2023/24, its fourth year, having started 6.17 million tutoring courses.

Sources

  1. Private Tutoring 2026, Sutton Trust, February 2026.
  2. New Sutton Trust report values private tuition market at up to £2bn, Sutton Trust, 7 September 2016.
  3. Parents pay private tutors £24 an hour, Sutton Trust, 11 September 2016.
  4. National Tutoring Programme, academic year 2023/24, Department for Education, updated 19 December 2024.
  5. Average tutoring rates in the UK, TutorCruncher, 15 May 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.