the decision pattern.TDP.

Europe tyres market size 2025

European tyre makers sold about 245 million replacement tyres in 2025, including 224 million car tyres, down about 1.5% on 2024. Paid-report publishers value the whole European tyre market, including original equipment, at roughly $47bn.

Medium confidenceResearched 2 November 20265 linked sources
Market size 2025
245 million replacement tyres
Range
$46.6bn (Mordor, all channels) – 459 million units including original equipment (IMARC)
Forecast
$56.4bn by 2031
Growth
2.3%–3.3% a year (2026–2031/34); replacement volumes down 1.5% in 2025

Market size

The most reliable measure of the European tyre market is the replacement sales pool published by Tyres Europe (the industry body formerly known as ETRMA). Its members sold 224.1 million consumer tyres (passenger car, SUV and light commercial) in Europe in 2025, down 2% on 2024. Adding truck and bus (11.0 million), agricultural (0.7 million) and motorcycle and scooter (9.3 million) tyres gives about 245 million replacement tyres, which is our own addition of the four segment totals.

No official body publishes a value figure for the whole market, so value estimates come from paid-report publishers. Mordor Intelligence puts the Europe tyre market at $46.55bn in 2025, covering both replacement and original equipment, with the aftermarket at 69% of value. IMARC sizes the same market by volume at 458.9 million units in 2025, with replacement at 54%. That implies about 248 million replacement units (our calculation), close to the Tyres Europe figure.

Measure20242025ChangeSource
Consumer replacement tyres227.7m224.1m-2%Tyres Europe
Truck and bus replacement tyres11.5m11.0m-4%Tyres Europe
Agricultural replacement tyres715k688k-4%Tyres Europe
Moto and scooter replacement tyres9.0m9.3m+4%Tyres Europe
All replacement segments (our addition)248.9m245.2m-1.5%Our calculation
Total market value, all channels–$46.55bn–Mordor Intelligence
Total market volume, all channels–458.9m units–IMARC

What drives it

  • All-season tyres are taking share. In 2025 all-season volumes rose 5% while summer tyres fell 7% and winter tyres fell 2%, with a 14% drop in winter sales in the fourth quarter after a mild start to winter. Mordor estimates all-season at 47% of market value.
  • The market has not recovered 2019 volumes. Full-year 2024 consumer volumes (223.3 million as first reported) were 3.5% below 2019, and truck and bus volumes were 10.3% below.
  • Imports pressure the truck segment. Tyres Europe says rising non-member volumes weigh on truck tyre sales despite anti-dumping duties.
  • Germany is the largest market. Mordor gives Germany 21.3% of 2025 value, with Spain the fastest-growing country at 6.2% a year to 2031.

How this estimate was made

  1. The headline is the Tyres Europe 2025 replacement pool, reported by European Rubber Journal in February 2026, because it is actual member sales data rather than a model.
  2. We added the four segments ourselves (224,133 + 11,020 + 688 + 9,345 thousand units) to get 245.2 million, and did the same for 2024 (248.9 million) to derive the 1.5% decline. Tyres Europe reports segments, not a grand total.
  3. The 2024 consumer figure was restated. Tyrepress reported 223.3 million for 2024 in January 2025, while the February 2026 release shows 227.7 million for the same year. The difference reflects a changed membership base, so we compare 2025 only with the restated figure.
  4. Value comes from Mordor ($46.55bn in 2025, 3.26% growth to $56.43bn in 2031). IMARC gives volume only (2.35% growth to 565.7 million units in 2034). Both cover original equipment as well as replacement, so their figures are not comparable with the Tyres Europe pool.
  5. The pool covers Tyres Europe members only and does not break out country sales, so the share of imports and the geographic scope of "Europe" are only roughly known.

Questions

How many tyres are sold in Europe each year?

Tyres Europe members sold about 224 million replacement car, SUV and van tyres in 2025, plus 11 million truck and bus, 0.7 million agricultural and 9.3 million motorcycle tyres, about 245 million in total by our addition. IMARC estimates 459 million units in 2025 once original equipment fitments are included.

What is the European tyre market worth?

Mordor Intelligence values the Europe tyre market at $46.55bn in 2025, rising to $56.43bn by 2031. About 69% of that value is replacement (aftermarket) sales.

Is the European tyre market growing?

Not in volume. Replacement consumer tyre sales fell 2% in 2025 and truck and bus tyres fell 4%, after a 5% consumer recovery in 2024. Paid-report publishers expect value growth of 2% to 3% a year, driven by mix rather than more units.

Which tyre type is growing fastest in Europe?

All-season tyres. Their replacement volumes rose 5% in 2025 while summer tyres fell 7%, and they have grown in every reporting period since 2024.

Sources

  1. Tyres Europe reports 'softness' across key market segments in 2025, European Rubber Journal, 6 February 2026.
  2. ETRMA – consumer tyre volumes turn negative in H1 2025, Tyrepress, 29 July 2025.
  3. Q4 2024 growth for ETRMA members, but tyre volumes still below 2019 levels, Tyrepress, 30 January 2025.
  4. Europe Tire Market Size and Share, Mordor Intelligence, updated September 2026 (estimates as of January 2026).
  5. Europe Tire Market, IMARC Group, updated 24 June 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.