the decision pattern.TDP.

Global uranium mining market size 2024

World mines produced 60,213 tonnes of uranium in 2024, about 90% of reactor needs, according to the World Nuclear Association. Kazakhstan supplied 39%. At 2025 realised prices of $62–65/lb that output is worth roughly $10bn a year, and WNA sees requirements doubling by 2040.

High confidenceResearched 2 November 20266 linked sources
Market size 2024
60,213 tonnes of uranium mined
Range
60,213 tU mined in 2024 against 68,920 tU of reactor requirements in 2025; about $10bn–$11bn a year at 2025 prices (our calculation)
Forecast
just over 150,000 tU a year of reactor requirements by 2040 (WNA reference scenario)
Growth
mine output up 10.6% in 2024 (our calculation from WNA figures)

Market size

The World Nuclear Association (WNA) counts 60,213 tonnes of uranium (tU) mined worldwide in 2024, up from 54,433 tU in 2023 and 49,614 tU in 2022. Mines covered about 90% of reactor requirements in 2024, up from about 78% in 2022; the rest came from secondary supplies. WNA's 2025 World Nuclear Fuel Report puts reactor requirements at about 68,920 tU in 2025.

Uranium is sold mostly under long-term contracts, so there is no single market value. Converting 60,213 tU to about 156.5 million lb of U3O8 and applying the 2025 realised prices reported by Cameco ($62.11/lb) and Kazatomprom ($65.32/lb) gives roughly $9.7bn to $10.2bn; at the 2025 average spot price of $72.75/lb it would be about $11.4bn. These are our calculations, not published figures.

MeasureFigurePeriod / source
World mine production60,213 tU2024, WNA
Reactor requirements68,920 tU2025, WNA Fuel Report
Kazatomprom production (100% basis)25,839 tU2025, Kazatomprom
Cameco production (its share)8,078 tU2025, Cameco via WNN
Average weekly spot price$72.75/lb2025, Kazatomprom
Spot / long-term price$80.00 / $85.00 per lbend October 2025, Cameco via ANS

Who produces it

  • Kazakhstan dominates. It mined 23,270 tU in 2024, 39% of the world total, followed by Canada (14,309 tU, 24%), Namibia (7,333 tU, 12%), Australia (4,598 tU) and Uzbekistan (about 4,000 tU). In-situ leaching accounted for about 55% of world output.
  • Five companies mine most of it. In 2024 Kazatomprom produced 12,463 tU on an attributable basis, Cameco 10,193 tU, Orano 6,815 tU, Uranium One 5,829 tU and CGN 5,761 tU.
  • 2025 output rose again. Kazatomprom's mines produced 25,839 tU on a 100% basis in 2025 (13,519 tU attributable), and it guides to 27,500–29,000 tU in 2026, subject to sulphuric acid supply. Cameco's share of production was 21.0 million lb (8,078 tU), above its revised guidance.
  • Prices firmed through 2025. Cameco's reported spot price ran from a low of $64.23/lb in March to $80.00/lb at the end of October 2025, when its long-term price indicator reached $85.00/lb, the year's high. Realised prices ($65.32/lb at Kazatomprom, $62.11/lb at Cameco) sat well below spot because of older contracts.
  • Contract books are long. Cameco holds about 230 million lb of long-term commitments and reported 2025 uranium revenue of C$2,874m on 33.0 million lb sold.

How this estimate was made

  1. The headline is WNA's 2024 mined output (60,213 tU), its most recent full-year figure; the WNA table ends at 2024.
  2. Demand comes from WNA's 2025 Fuel Report reference scenario: 68,920 tU in 2025, rising to just over 150,000 tU by 2040 as nuclear capacity grows from 372 GWe in 2024 to 746 GWe.
  3. The 10.6% growth figure is our calculation: 60,213 divided by 54,433. The dollar range is our calculation using 1 tU = about 2,600 lb U3O8 and the 2025 prices above; realised prices lag spot, so actual 2024 sales value differs from both ends.
  4. Company figures for 2025 come from Kazatomprom's and Cameco's own results and World Nuclear News.
  5. Confidence is high because WNA and the two largest producers are independent, filing-grade sources that agree. Missing: a 2025 world production total, not yet published by WNA.

Questions

How much uranium is mined each year?

About 60,213 tonnes of uranium in 2024, according to the World Nuclear Association, up from 54,433 tonnes in 2023. That met about 90% of reactor requirements.

Which country produces the most uranium?

Kazakhstan, with 23,270 tU in 2024, or 39% of the world total. Canada was second with 14,309 tU (24%) and Namibia third with 7,333 tU (12%).

What is the uranium market worth?

There is no official figure. Our calculation values 2024 mined output at about $10bn at the $62–65/lb realised prices of 2025, or about $11.4bn at the 2025 average spot price of $72.75/lb.

Will uranium demand grow?

WNA's reference scenario puts reactor requirements at about 68,920 tU in 2025 and just over 150,000 tU in 2040, and warns that existing mines face depletion in the mid-2030s.

Sources

  1. World Uranium Mining Production, World Nuclear Association, updated 23 October 2026.
  2. World Nuclear Fuel Report 2025: investment in nuclear fuel cycle needed as demand for nuclear power grows, World Nuclear Association, 5 September 2025.
  3. Kazatomprom announces 2025 full year financial results, Kazatomprom via FCA National Storage Mechanism, 20 March 2026.
  4. Cameco announces 2025 results (Q4 news release), Cameco, 13 February 2026.
  5. Cameco, Kazatomprom release 2025 production figures, World Nuclear News, 17 February 2026.
  6. Uranium market prices reflect higher demand, American Nuclear Society Nuclear Newswire, 10 November 2025.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.