Market size
No official statistic measures US vehicle telematics revenue, so the value depends on which paid report you read. P&S Intelligence puts the US fleet telematics systems market at $5.1bn in 2024 and about $5.8bn in 2025, with hardware 55% of the total, growing 15.7% a year to $16.0bn by 2032. IMARC Group's "US commercial telematics" scope, which adds insurance telematics, V2X and managed services, is far larger at $21.4bn in 2024, heading to $61.0bn by 2033 at 12.3% a year. They differ by four times, so we publish both.
The firmest numbers are counts rather than dollars. Berg Insight estimates 19.2 million active fleet management units in North American commercial vehicle fleets at the end of 2024, rising to 33.2 million by 2029 (11.6% a year). Company filings give a second anchor: Samsara's annual recurring revenue was $1.458bn in February 2025 and Motive's $501m in September 2025, about 91% of it from US customers.
| Measure | Value | Period / source |
|---|---|---|
| US fleet telematics systems | $5.1bn (2024), $5.8bn (2025) | P&S Intelligence, March 2025 |
| US commercial telematics (wide scope) | $21.4bn | 2024, IMARC Group |
| Active fleet units, North America | 19.2 million | Q4 2024, Berg Insight |
| Active fleet units, North America forecast | 33.2 million | 2029, Berg Insight |
| Samsara ARR / FY25 revenue | $1.458bn / $1.249bn | FY to 1 Feb 2025, SEC filing |
| Motive ARR | $501m, +28% | 30 Sep 2025, S-1 filing |
| Geotab connected subscriptions (global) | 5 million | Nov 2025, company release |
Leading players
- Geotab is Berg Insight's clear North American leader with several million subscribers, and passed 5 million subscriptions worldwide in 2025. In October 2025 it bought Verizon Connect's international operations.
- Samsara is the runner-up by units but the largest by disclosed revenue: FY2025 revenue of $1.249bn, up 33%, with 2,506 customers paying over $100,000 a year; FY2026 guidance is $1.523bn–$1.533bn.
- Verizon Connect, CalAmp and Lytx each have around one million North American units; the top five together hold about 50% of active units.
- Motive (nearly 100,000 customers, more than one million vehicles and assets, ARR $501m) filed for an IPO in December 2025 and estimates its global opportunity at "at least $187bn", including about $60bn for driver safety and fleet management. That is a company estimate.
- Platform Science, Powerfleet, Bridgestone Mobility and others form a long tail; ten vendors have at least 500,000 North American units.
How this estimate was made
- The headline is P&S Intelligence's $5.8bn for 2025 because its scope (fleet hardware plus software) matches what most readers mean by vehicle telematics, and it is the more conservative of the two paid reports.
- We cross-checked it against Berg Insight's 19.2 million units. If each unit carried $300–$500 a year in hardware and subscription revenue, the North American market would be $5.8bn–$9.6bn (our calculation, not a published figure). Motive's ARR per vehicle or asset is roughly $400, inside that band.
- The upper end of the range is IMARC's $21.4bn, which includes insurance telematics, OEM-embedded connectivity and services that P&S excludes.
- Forecast and growth are P&S's; Berg's 11.6% unit growth is shown separately because volume and value grow at different rates.
- Confidence is low because the only dollar figures are paid reports that disagree by more than 50%; the unit counts and filings are solid but do not add up to a market total.
Questions
How big is the vehicle telematics market in the US?
Estimates range from $5.8bn in 2025 for fleet telematics systems (P&S Intelligence) to $21.4bn in 2024 for all commercial telematics (IMARC). The scopes differ, and there is no official measurement.
How many vehicles in North America have telematics?
Berg Insight counted about 19.2 million active fleet management units in North American commercial fleets at the end of 2024, and expects 33.2 million by 2029.
Who are the biggest telematics companies in the US?
Geotab leads by units with several million North American subscribers and 5 million worldwide. Samsara is second by units and largest by disclosed revenue ($1.249bn in FY2025), followed by Verizon Connect, CalAmp and Lytx, then Motive.
How fast is the telematics market growing?
P&S Intelligence forecasts 15.7% a year to 2032; Berg Insight expects the installed base to grow 11.6% a year to 2029. Samsara grew revenue 33% in FY2025 and Motive's ARR grew 28% in the year to September 2025.
Sources
- Samsara reports fourth quarter and full fiscal year 2025 financial results, Samsara Inc. via SEC EDGAR (exhibit 99.1), 6 March 2025.
- Motive Technologies Form S-1 registration statement, SEC EDGAR, 23 December 2025.
- Geotab surpasses 5 million global subscriptions, Geotab, 4 November 2025.
- North American fleet management systems to show double-digit growth to 2029, Computer Weekly (reporting Berg Insight), undated, late 2025.
- The installed base of fleet management systems in North America to reach 33 million units by 2029, TyN Magazine (Berg Insight release), undated, late 2025.
- United States commercial telematics market size, share and forecast 2025-2033, IMARC Group, 13 February 2025.
- U.S. fleet telematics systems market size and forecast 2032, P&S Intelligence, March 2025.