Market size
India's warehousing market is measured in floor space, not rupees. JLL counts 293 million sq ft of Grade A stock across the eight main cities at the end of March 2026, up nearly 20% in a year and 57% of a total stock of 514 million sq ft. Knight Frank's year-end 2025 count for the same eight cities is 549 million sq ft of total stock, of which 45% was Grade A, or about 247 million sq ft (our calculation). The two draw city boundaries and the Grade A line differently, hence the range.
Demand was a record in 2025. Knight Frank recorded 72.5 million sq ft of transactions, up 29% from 56.4 million sq ft in 2024, and JLL's gross absorption was 73.7 million sq ft. CBRE's narrower industrial and logistics series shows 37 million sq ft leased in January to September 2025, up about 28%.
| Measure | Figure | Period | Source |
|---|---|---|---|
| Grade A stock, eight cities | 293 mn sq ft (57% of 514 mn sq ft) | Q1 2026 | JLL |
| Total stock, eight cities | 549 mn sq ft, 45% Grade A | end-2025 | Knight Frank |
| Transactions, eight cities | 72.5 mn sq ft, up 29% | 2025 | Knight Frank |
| Gross absorption | 73.7 mn sq ft | 2025 | JLL |
| Industrial and logistics leasing | 37 mn sq ft, up about 28% | Jan–Sep 2025 | CBRE |
| Absorption | 34.8 mn sq ft, up 2.4%; supply 42.7 mn sq ft | H1 2026 | Savills |
| Vacancy, eight cities | 11.6% | end-2025 | Knight Frank |
What drives it
- Manufacturing has overtaken 3PL. In Knight Frank's data, manufacturing (excluding FMCG and consumer durables) took 47% of 2025 transactions, 34 million sq ft and up 55%, while third-party logistics fell to 27% (19.6 million sq ft). CBRE, with a different occupier mix, still had 3PL at about 44% of second-half absorption.
- Pune and Mumbai lead. Pune transacted 16.0 million sq ft in 2025, up 86%, Mumbai 13.5 million sq ft, up 31%, and NCR 12.2 million sq ft. Stock is largest in Mumbai (169.7 million sq ft) and NCR (115.4 million sq ft); vacancy is highest in Bengaluru (19.1%) and lowest in Kolkata (8.4%).
- Rents rose 1% to 5%. Weighted average transacted rents in 2025 ranged from ₹18.6 per sq ft a month in Ahmedabad to ₹28.0 in Pune.
- Grade A takes a growing share of deals. 63% of Knight Frank's 2025 transactions were Grade A; Savills put the Grade A share of H1 2026 absorption at 59%, up from 55%.
- Supply is catching up. Savills recorded 42.7 million sq ft of new supply in H1 2026, up 27.8%, against 34.8 million sq ft absorbed.
How this estimate was made
- The headline is JLL's 293 million sq ft of Grade A stock at Q1 2026 because it is the most recent published Grade A figure for the eight main cities and gives a year-on-year rate.
- The low end of the range is our calculation: 45% of Knight Frank's 549 million sq ft end-2025 total stock, or about 247 million sq ft. Knight Frank does not publish the Grade A total directly.
- Knight Frank and JLL leasing figures agree within 2%. CBRE's are lower because they cover a narrower set of parks and only nine months; Savills and Vestian include tier II and III cities, so none of the series are interchangeable.
- The forecast is JLL's: total stock of nearly 850 million sq ft by 2030, an 11.4% a year increase. A separate JLL note put all-India stock above 610 million sq ft in 2025, with 53% Grade A; that figure covers more cities than the 514 million sq ft eight-city count and we do not mix the two.
- What is missing: a rupee value for the market. No fetched source gives warehousing revenue or rent roll in rupees, so the page stays in floor space.
Questions
How much Grade A warehousing does India have?
About 293 million sq ft across the eight main cities at the end of March 2026, according to JLL, 57% of total stock of 514 million sq ft. Knight Frank's end-2025 data implies about 247 million sq ft.
How much warehouse space was leased in India in 2025?
A record 72.5 million sq ft across eight cities according to Knight Frank, up 29% on 2024, and 73.7 million sq ft of gross absorption in JLL's count. Manufacturing was the largest occupier.
Which Indian city has the most warehousing?
Mumbai, with 169.7 million sq ft of stock at end-2025 (Knight Frank), followed by NCR at 115.4 million sq ft. Pune was the most active market for new leases in 2025 at 16.0 million sq ft.
Sources
- India Warehousing Market Report 2025, Knight Frank India, early 2026 (calendar 2025 data).
- India's industrial-warehousing stock reaches 514 million sq ft, set to touch 850 million sq ft by 2030: JLL, Logistics Insider (JLL data), 8 June 2026.
- India's warehousing stock set to expand by 240 mn sq ft by 2030 as Tier II cities gain momentum: JLL, NBM&CW (JLL data), 15 May 2026.
- All-time high: industrial and logistics leasing rises 28% in first nine months of 2025, CBRE India, 17 October 2025.
- India Logistics Figures H2 2025, CBRE, 13 February 2026.
- Industrial demand touches 34.8 million sq ft: Savills, Construction World (Savills India data), 3 July 2026.
- India's warehousing sector rebounds in 2026, eyes 45 mn sq ft annual absorption: Vestian, NBM&CW (Vestian data), 29 April 2026.