Market size
Nobody publishes a value for Germany's wind turbine maintenance market, so this page builds one from the installed fleet and surveyed operating costs. At the end of 2025 Germany had 68,067 MW of onshore wind across 29,226 turbines (Fachagentur Wind und Solar for BWE and VDMA) and 9,740 MW of grid-connected offshore wind across 1,680 turbines (Deutsche WindGuard), a combined 77.8 GW and about 30,900 machines with an average onshore age of 15.5 years.
Deutsche WindGuard's cost survey for the Federal Ministry for Economic Affairs puts total onshore operating costs at about 49 €/kW a year in a turbine's first decade and 57 €/kW in its second, with maintenance and servicing (Wartung und Instandhaltung) the largest item after land lease at 27% to 30%. That gives 14.7 to 15.4 €/kW a year for maintenance. Multiplied by the onshore fleet, onshore maintenance spend is roughly €1.0bn to €1.1bn a year (our calculation). Total onshore operating costs, including lease, insurance and management, come to €3.3bn to €3.9bn a year on the same basis.
| Measure | Figure | Date | Source |
|---|---|---|---|
| Onshore capacity | 68,067 MW | 31 Dec 2025 | FA Wind und Solar |
| Onshore turbines | 29,226 | 31 Dec 2025 | FA Wind und Solar |
| Offshore capacity (grid-connected) | 9,740 MW, 1,680 turbines | 31 Dec 2025 | Deutsche WindGuard |
| Onshore operating cost | 49–57 €/kW a year | 2024 survey | Deutsche WindGuard |
| Maintenance share of operating cost | 27%–30% | 2024 survey | Deutsche WindGuard |
| Onshore fixed OPEX assumption | 32 €/kW plus 0.7 ct/kWh | 2024 | Fraunhofer ISE |
| Offshore fixed OPEX assumption | 39 €/kW plus 0.8 ct/kWh | 2024 | Fraunhofer ISE |
| Onshore maintenance spend | €1.0bn–€1.1bn a year | 2025 | our calculation |
What drives it
- An ageing fleet. About 10,400 onshore turbines are older than 20 years and about 12,600 MW has left EEG support. WindGuard's data show operating costs rise about 16% from the first to the second decade of life.
- Record additions. 958 new onshore turbines (5,232 MW) were commissioned in 2025, of which 279 (1,548 MW) were repowering projects. 456 old turbines (631 MW) were decommissioned, so the net gain was 4,602 MW.
- Full-service contracts dominate. WindGuard reports that most new projects plan full-maintenance contracts (Vollwartungsverträge) covering the whole 20-year life, typically with a fixed and a variable component.
- Offshore is smaller but costlier. 518 MW started feeding the grid in 2025, with a further 890 MW installed but not yet connected. Fraunhofer ISE assumes higher offshore OPEX than onshore.
- Component replacement is extra. Wood Mackenzie estimated Europe's major component replacement market at €518m by 2030, growing about 10% a year, on top of routine servicing.
How this estimate was made
- The installed base comes from the two annual status reports commissioned by BWE and VDMA Power Systems: FA Wind und Solar for onshore and Deutsche WindGuard for offshore, both published in January 2026.
- Cost inputs come from Deutsche WindGuard's "Kostensituation der Windenergie an Land, Stand 2024" for the BMWK. We took the maintenance share (30% of 49 €/kW in decade one; 27% of 57 €/kW in decade two) to get 14.7 to 15.4 €/kW a year, and multiplied by 68,067 MW: about €1.00bn to €1.05bn.
- The cost data describe projects commissioned in 2024 to 2026, which use large modern turbines. Older, smaller machines cost more per MW to maintain, so our figure is more likely to be too low than too high.
- Offshore maintenance is not in the headline. Fraunhofer's offshore fixed OPEX alone (39 €/kW) implies at least €380m a year for 9,740 MW, before variable costs, but we could not isolate the maintenance share.
- Wood Mackenzie publishes onshore O&M cost per MW by market, but the reports are paywalled and no figures appear on the public pages, so we could not use them. IRENA's 2024 cost report gives Denmark onshore O&M at $40/kW a year but no German figure. Confidence is low because the value is derived, not measured.
Questions
How many wind turbines are there in Germany?
About 30,900 at the end of 2025: 29,226 onshore turbines with 68,067 MW (FA Wind und Solar) and 1,680 grid-connected offshore turbines with 9,740 MW (Deutsche WindGuard).
How much does it cost to maintain a wind turbine in Germany?
Deutsche WindGuard's 2024 survey puts total onshore operating costs at 49 €/kW a year in the first decade and 57 €/kW in the second, with maintenance and servicing at 27% to 30% of that, or about 15 €/kW a year. A 5 MW turbine therefore costs roughly €75,000 a year to service (our calculation).
How big is the wind O&M market in Germany?
Our calculation puts onshore maintenance and servicing at €1.0bn to €1.1bn a year, and total onshore operating costs at €3.3bn to €3.9bn. There is no published market value; these are derived figures.
How old is Germany's wind fleet?
The average onshore turbine was 15.5 years old at end-2025. About 10,400 turbines are older than 20 years and about 12.6 GW has left EEG support.
Sources
- Status des Windenergieausbaus an Land in Deutschland, Jahr 2025, Fachagentur Wind und Solar for BWE and VDMA Power Systems, 15 January 2026.
- Status des Offshore-Windenergieausbaus in Deutschland, Jahr 2025, Deutsche WindGuard for BWE, VDMA Power Systems and partners, 27 January 2026.
- Kostensituation der Windenergie an Land in Deutschland, Stand 2024, Deutsche WindGuard for the Bundesministerium für Wirtschaft und Klimaschutz, 1 October 2024 (corrected 2 December 2024).
- Stromgestehungskosten Erneuerbare Energien 2024, Fraunhofer ISE, July 2024.
- IRENA report: onshore and offshore wind the most cost-competitive power generation globally, BalticWind.EU (on IRENA Renewable Power Generation Costs in 2024), 28 July 2025.
- Wind turbine replacements to cost Europe €3.9bn by 2030, Wood Mackenzie, 17 August 2021.