the decision pattern.TDP.

Andon

Cash & operations

Andon is a visual or audible management signal that shows operating status and calls attention to an abnormal condition. It connects detection by a person or system with a defined response, escalation path, and, when necessary, controlled stop.

By The Decision Pattern · Updated

A question to consider

Which abnormal conditions require immediate help or a controlled stop, and can the responsible team respond before harm moves downstream?

Why it matters

A defect, shortage, delay, or equipment problem becomes more expensive as it travels downstream. A visible call for help enables response near the source and supplies structured evidence about recurring barriers to normal work.

How it works

Define normal and abnormal conditions, who can trigger the signal, expected response time, responder role, containment and stop rules, status meanings, restoration authority, and how events are recorded for later cause analysis.

How to interpret it

Signal volume depends on standards, detection, psychological safety, and system stability. Fewer calls can mean improvement or suppressed reporting; response time and problem recurrence provide necessary context.

Common mistake

Installing lights or software without staffing a response or protecting the person who raises the alert. Unanswered signals train teams to work around problems and destroy trust in the control.

Put it to work

Pilot one critical abnormality, make trigger and ownership unambiguous, rehearse containment, measure call-to-response and restoration, review repeat causes daily, and redesign work so the same signal becomes less necessary.

A practical example

Illustrative example: an operator flags a torque-reading failure; the team leader arrives within one cycle, contains three units, and stops release until calibration is confirmed.

Questions worth asking

Does every andon call stop the line?

No. The defined response may solve the issue within cycle, contain output, slow work, or stop at a safe point.

What makes an andon system effective?

Clear triggers, rapid skilled response, authority to protect quality, psychological safety, event learning, and removal of recurring causes.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.

  • Lean Enterprise Institute — Andon

    Andon as a visual management signal for operating status, abnormalities, and rapid response by the responsible team.

    Source checked

Put the thinking to work.

Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.

Find your reportExplore Executive Editor