Continuous review system
Cash & operations
A continuous review system, also called a fixed-order-quantity or $(Q, R)$ system, is an inventory control method that tracks the real-time inventory position after every transaction and triggers a fixed replenishment order of size $Q$ the moment available stock drops to or below a predetermined reorder point $R$.
By The Decision Pattern · Updated
A question to consider
Are our perpetual inventory records accurate enough to trigger fixed-quantity orders at the exact reorder point and reduce our safety-stock investment?
Why it matters
For high-value, fast-moving, or mission-critical items where barcode and ERP tracking already log every receipt and withdrawal in real time, waiting until next month's calendar review to place an order either risks a stockout or forces the company to carry bloated safety stock. Continuous review minimizes required buffer stock by reacting immediately when the threshold is crossed.
How it works
Perpetual inventory software monitors the inventory position (on-hand plus on-order minus committed backorders) after every transaction. Whenever the position reaches or falls below the reorder point $R$—sized to expected demand during the supplier delivery lead time $L$ plus safety stock for lead-time uncertainty—the system releases a fixed order quantity $Q$ (often based on economic order quantity or pallet multiples).
How to interpret it
Because an order can be placed on any day, safety stock only needs to protect against uncertainty during the supplier lead time $L$ itself, requiring less working capital than a periodic review system. However, independent $(Q, R)$ triggers across hundreds of SKUs can generate fragmented single-SKU purchase orders unless grouped or threshold-batched.
Common mistake
Triggering reorder-point alerts from physical on-hand stock alone without adding open purchase orders already in transit, which causes the system to place duplicate replenishment orders every day until the first truck arrives.
Put it to work
Use continuous $(Q, R)$ control for Class A and B items with accurate perpetual inventory records, always evaluate triggers against total inventory position (including on-order stock), and recalculate $R$ whenever supplier lead times or demand volatility shift.
A practical example
Illustrative example: a distributor tracks a $450 industrial pump continuously with daily demand of 10 units, a 7-day lead time, and 25 units of safety stock ($R = 95$); when a 12-unit customer order drops the inventory position from 102 to 90, the ERP immediately releases a fixed order of $Q = 150$ units.
Questions worth asking
What stays constant and what varies in a continuous review system?
The order quantity $Q$ and reorder point $R$ stay constant (for a given demand regime), while the time interval between orders varies depending on how fast customers buy.
What is "inventory position" in a continuous review system?
Inventory position equals on-hand stock plus stock already on order from suppliers minus committed customer backorders or allocations.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- Silver, Pyke, and Thomas — Inventory and Production Management in Supply Chains (Continuous Review Q, R Systems)
Perpetual inventory position tracking, reorder point $R$ sizing over lead time $L$, and fixed order quantity $Q$ optimization.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor