Internal rate of return

Planning & decisions

Internal rate of return is the discount rate that makes a project's net present value equal to zero for a specified series of cash flows. It expresses a modelled return rate, subject to the cash-flow pattern and assumptions.

By The Decision Pattern · Updated

A question to consider

Does the project's modelled return clear the justified benchmark while also creating sufficient absolute value?

Why it matters

IRR provides a percentage that can be compared with a required return, making an investment easier to discuss. It can mis-rank projects of different scale or timing and may have multiple solutions.

How it works

Specify dated incremental cash flows and solve for the rate at which their discounted sum equals zero. Use consistent periods and validate the result by recalculating NPV at that rate.

How to interpret it

Compare IRR with the appropriate hurdle rate only after checking NPV, absolute scale, reinvestment assumptions, constraints, and risk. Unconventional sign changes can create multiple or unusable rates.

Common mistake

Choosing the highest percentage without considering how much value the project creates. A small project can have higher IRR while adding less total value than a larger feasible alternative.

Put it to work

Show NPV at the decision's discount rate beside IRR, graph NPV across rates when cash-flow signs change, and test the most uncertain operating inputs.

A practical example

Illustrative example: an investment costs ₹100,000 now and returns ₹60,000 after each of two years. The IRR is approximately 13.1%, the rate that makes those discounted flows sum to zero.

Questions worth asking

Can a project have more than one IRR?

Yes. Cash-flow sequences that change sign more than once can produce multiple mathematical solutions, making NPV profiles more informative.

Is the project with the highest IRR always best?

No. Project size, timing, duration, reinvestment, risk, capital limits, and absolute NPV can make another feasible option preferable.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.

  • ACCA — Investment appraisal

    Payback, net present value, and internal-rate-of-return methods using relevant incremental cash flows.