the decision pattern.TDP.

Kaizen costing

Cash & operations

Kaizen costing is an operational cost-reduction system applied during the active manufacturing phase of an existing product that sets incremental monthly or quarterly cost-down targets below current standard cost, achieved through continuous shop-floor process improvements rather than major product redesigns.

By The Decision Pattern · Updated

A question to consider

Which recurring conversion, scrap, or setup wastes on our active production line can be systematically engineered out to offset annual price erosion?

Why it matters

After launch, production teams can continue investigating avoidable costs even when the product design remains stable. Kaizen costing seeks to improve production economics by reducing setup waste, scrap, motion losses, and line bottlenecks during routine production.

How it works

Instead of holding an annual standard cost fixed for twelve months and merely measuring variances against that static baseline, management sets a dynamic cost-reduction target from the prior period's actual unit cost (for example, a 3% reduction in conversion cost per unit over the year). Frontline operators, supervisors, and process engineers run structured improvement cycles targeting material yield, cycle time, energy usage, and tool wear to lock in a lower baseline each quarter.

How to interpret it

Kaizen costing focuses on variable conversion, overhead, and yield improvements because major component-architecture changes would require re-tooling and engineering change orders. Track cost reductions alongside defect rates and safety incidents to ensure savings come from waste removal rather than corner-cutting.

Common mistake

Imposing arbitrary top-down budget cuts across departments without giving frontline teams engineering support, time, or authority to modify workstation layouts, tooling fixtures, and work instructions.

Put it to work

Pair target costing before launch with kaizen costing after launch, anchor monthly targets in the previous month's actual conversion cost, focus shop-floor teams on scrap, setup time, and micro-stoppages, and update standard costs as improvements stabilize.

Source and scope

ACCA: Advanced Performance Management, December 2011 answers, question 5(b) supports the method described here. The business example is hypothetical; the source does not document its outcome.

A practical example

Illustrative example: a motor-assembly line starts the year at an actual conversion cost of $14.20 per unit and sets a 5% annual kaizen target ($13.49); by rebalancing workstation tasks, reducing copper-winding scrap by 1.4%, and cutting adhesive curing energy, the cell reaches $13.40 by Q4 without changing motor drawings.

Questions worth asking

How does kaizen costing differ from standard costing?

Standard costing measures compliance against a fixed engineering cost standard, whereas kaizen costing continuously lowers the cost baseline each period through incremental process improvements.

How do target costing and kaizen costing work together across a product life cycle?

Target costing designs cost out of the product before manufacturing begins, while kaizen costing drives continuous process efficiency after the product is in production.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.

Put the thinking to work.

Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.

Find your reportExplore Executive Editor