the decision pattern.TDP.

Null hypothesis

Planning & decisions

A null hypothesis is the reference statistical claim tested with sample data, often representing no difference, no association, or a specified parameter value. A test either rejects it under stated rules or fails to reject it.

By The Decision Pattern · Updated

A question to consider

What precise reference claim will the data challenge, and what evidence and error rate justify changing the decision?

Why it matters

A clear null defines what the evidence is being compared against and makes error rates interpretable. Without a prespecified claim, analysts can shift the target after seeing results and overstate chance patterns.

How it works

State the population parameter and direction before analysis, define a contradictory alternative, choose the test and assumptions, set the significance level, calculate a test statistic and p-value, then apply the decision rule.

How to interpret it

Failing to reject the null does not prove it true. Data may be compatible with it because the effect is small, measurement is noisy, the sample lacks power, or assumptions are inappropriate.

Common mistake

Writing the null after inspecting the estimates or translating nonsignificance into evidence of equivalence. Equivalence requires margins and a design capable of ruling out effects that matter.

Put it to work

Tie the null and alternative to the decision threshold, preregister primary tests, check assumptions and power, report estimates and intervals with the test, and separate confirmatory conclusions from exploratory findings.

A practical example

Illustrative example: before a pricing test, the team specifies a null that conversion change equals zero and a two-sided alternative that it differs from zero.

Questions worth asking

Does failing to reject the null prove no effect?

No. It means the chosen data and method did not provide enough evidence to reject that particular reference claim.

Must a null hypothesis always state zero effect?

No. It can specify another parameter value, boundary, noninferiority margin, or composite set appropriate to the question.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.

Put the thinking to work.

Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.

Find your reportExplore Executive Editor