Statistical power
Planning & decisions
Statistical power is the probability that a specified statistical test will detect an effect of a stated size when that effect truly exists. It equals one minus the false-negative probability and depends on effect size, sample size, variability, design, test, and significance threshold.
By The Decision Pattern · Updated
A question to consider
How much usable data does this design need to detect the smallest effect that would change our decision?
Why it matters
An underpowered study can spend money and expose users while remaining unlikely to detect a decision-relevant improvement. Planning power before data collection aligns the evidence design with the smallest effect worth acting on.
How it works
Define the primary outcome, minimum decision-relevant effect, baseline level and variability, analysis method, significance threshold, allocation, clustering, and expected attrition. Calculate required sample size, then test sensitivity to uncertain inputs and operational constraints.
How to interpret it
Power is a design property under explicit assumptions, not the probability that a statistically nonsignificant result is false. Actual missingness, noncompliance, imbalance, or noisier measurements can reduce effective power below the plan.
Common mistake
Running a post-hoc power calculation from the observed effect and p-value to explain an inconclusive study. Confidence intervals and compatibility with decision-relevant effects communicate the result more directly.
Put it to work
Register the primary analysis and inputs before launch, recruit for the planned usable sample, monitor data quality without peeking at outcomes, and report confidence intervals alongside significance and practical importance.
A practical example
Illustrative example: detecting a two-point conversion lift at 80% power needs 3,200 usable visitors per group under the stated baseline and threshold, plus an allowance for exclusions.
Questions worth asking
Is 80% power always sufficient?
No. The choice should reflect decision stakes, feasible sample size, false-negative cost, multiplicity, and the credibility of planning assumptions.
Does a large sample guarantee useful evidence?
No. Biased assignment, poor measurement, attrition, and an irrelevant outcome can invalidate a precise and highly powered estimate.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- NIST/SEMATECH — Sample sizes required
The relationship among sample size, significance level, false-negative probability, variability, and the effect a test is designed to detect.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor