Prediction interval

Planning & decisions

A prediction interval is a statistical range calculated from a model and past data that is expected, with a specified probability (such as 80% or 95%), to contain a single future observation or realization—combining both uncertainty about the true model parameters and the irreducible random variation of individual outcomes.

By The Decision Pattern · Updated

A question to consider

Are our operational buffers sized for the full range of the next actual outcome, or only for the narrow uncertainty around a long-run average?

Why it matters

Planners frequently mistake a confidence interval around the mean for the range of what will actually happen next month or on the next project. Because an individual future outcome fluctuates around the mean even if the average were known with certainty, a prediction interval is always wider than a confidence interval for the mean at the same probability level.

How it works

In regression or time-series forecasting, the standard error of prediction adds the variance of the estimated mean forecast and the variance of the individual error term (residual noise). As the forecast horizon lengthens or explanatory variables move away from historical averages, both parameter uncertainty and cumulative shock variance widen the interval.

How to interpret it

A 90% prediction interval means that if the data-generating process and model assumptions hold, roughly 9 out of 10 comparable future realizations should fall inside the band—and 1 in 10 will fall outside it. It does not account for structural breaks, regime changes, or unmodeled policy shifts.

Common mistake

Using a narrow confidence interval for the average outcome to size safety stock, project contingencies, or cash reserves, which systematically underestimates the volatility of the next single period or project.

Put it to work

Use prediction intervals—not mean confidence intervals—when setting cash buffers, SLA commitments, or inventory safety bounds; report both an 80% and a 95% band; and track empirical coverage out of sample to see if actual outcomes breach the band too often.

A practical example

Illustrative example: a model estimates average monthly warranty claims for a machine line at $50,000 with a 95% confidence interval for the mean of $47,000 to $53,000, but next month's 95% prediction interval is $34,000 to $66,000 because single-month claim noise is large.

Questions worth asking

Why is a prediction interval always wider than a confidence interval for the mean?

A confidence interval only captures uncertainty in estimating the average, whereas a prediction interval must also include the random period-to-period or unit-to-unit variation around that average.

Does gathering a larger historical sample reduce a prediction interval to zero?

No. More data shrinks parameter uncertainty toward zero, but the prediction interval remains bounded below by the intrinsic random variance of individual observations.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.