Predictive maintenance
Cash & operations
Predictive maintenance uses measured equipment condition and trends to detect developing degradation and schedule intervention before functional failure. Vibration, temperature, lubricant, electrical, acoustic, or process signals replace a fixed interval when they provide adequate warning.
By The Decision Pattern · Updated
A question to consider
Does measured condition provide enough reliable warning to intervene before this failure causes unacceptable operational or safety consequences?
Why it matters
Servicing too early wastes parts and can disturb healthy equipment; servicing too late creates failure. Condition evidence can extend useful operation while giving teams lead time to plan labor, spares, and production windows.
How it works
Select a failure mode with a detectable condition interval, establish measurement and alarm rules, collect comparable data, validate sensors and baselines, diagnose the trend, estimate remaining response time, and create planned work before the functional threshold.
How to interpret it
A model or alarm predicts a signal, not certainty. Sensor error, operating regime, data drift, false positives, missed failures, and the cost of delay must be assessed against the consequence of the target failure.
Common mistake
Buying sensors and calling every threshold breach predictive maintenance without linking signals to failure modes, validating lead time, assigning diagnostic ownership, or integrating alerts with work planning.
Put it to work
Pilot on a critical asset with known signatures, preserve operating context, test alert precision and warning time, document diagnostic decisions, connect alerts to work orders, and compare avoided failure with monitoring and false-alarm cost.
A practical example
Illustrative example: rising bearing vibration across four comparable readings triggers a planned weekend inspection, which confirms lubrication loss before heat and damage stop the line.
Questions worth asking
How is predictive maintenance different from preventive maintenance?
Predictive work responds to observed condition; preventive work follows a predefined time or usage interval regardless of current condition.
Does predictive maintenance require artificial intelligence?
No. Trend limits, inspections, oil analysis, vibration spectra, and engineering rules can be predictive without machine-learning models.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- U.S. Department of Energy — Operations & Maintenance Best Practices Guide
The definitions, operating logic, advantages, and limits of preventive, predictive, and reliability-centered maintenance programs.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor