Just-in-sequence

Just-in-sequence (JIS), or in-line vehicle sequencing, is an advanced lean logistics method that extends Just-in-Time (JIT) by delivering customer-specific components to the assembly line not only at the exact time needed, but pre-sorted in the exact unit-by-unit production order of the mixed-model final assembly line.

Cash & operationsRead definition

Just-in-time production

Just-in-time production is an operating system that makes and delivers only what is needed, when it is needed, in the amount needed. It depends on flow, pull signals, takt alignment, leveling, capable processes, and reliable supply.

Cash & operationsRead definition

Kaizen costing

Kaizen costing is an operational cost-reduction system applied during the active manufacturing phase of an existing product that sets incremental monthly or quarterly cost-down targets below current standard cost, achieved through continuous shop-floor process improvements rather than major product redesigns.

Cash & operationsRead definition

Kanban

Kanban is a controlled signal that authorizes production or movement of a specified item and quantity in a pull system. A card, container, electronic message, or other signal links downstream consumption to upstream replenishment.

Cash & operationsRead definition

Kano model

The Kano model classifies customer requirements by how their presence and performance relate to satisfaction, commonly distinguishing basic or expected needs, performance needs, and attractive or exciting needs. Classifications can differ by segment and change over time.

Markets & customersRead definition

Key assumptions check

A key assumptions check is a structured analytical review that explicitly surfaces the unstated premises, working hypotheses, and contextual conditions required for a conclusion, forecast, or strategy to hold true, then evaluates each assumption's evidentiary support and the impact if it fails.

Planning & decisionsRead definition

Key performance indicator

A key performance indicator is a deliberately selected measure used to judge progress or performance against a defined objective. It needs a formula, scope, data source, frequency, owner, target context, and decision response.

Planning & decisionsRead definition

Key risk indicator

A key risk indicator, or KRI, is a metric selected to signal material change in exposure to a specific risk. A useful KRI has a defined owner, calculation, data source, reporting frequency, thresholds, and pre-agreed response.

Planning & decisionsRead definition

Kruskal driver analysis

Kruskal driver analysis, or relative-importance analysis via Kruskal's method, is a statistical key-driver technique that overcomes multicollinearity among correlated survey attributes by averaging each predictor's squared partial correlation (or incremental $R^2$) across all $p!$ possible entry orderings of the $p$ predictors.

Markets & customersRead definition

Laddering interview

A laddering interview is a qualitative in-depth research technique grounded in means-end chain theory that repeatedly probes why a concrete product attribute matters to a customer, tracing the link from observable product features ("attributes") to functional and psychosocial outcomes ("consequences") and ultimately to core personal or organizational priorities ("values").

Markets & customersRead definition

Lagging indicator

A lagging indicator measures an outcome or event after it has occurred. It confirms performance, consequence, or failure for a completed period but may provide limited time to prevent that particular result.

Planning & decisionsRead definition

Landed cost

Landed cost is the total cost to bring a purchased item to a specified destination and condition for use or sale. Depending on the declared scope, it may include purchase price, freight, insurance, duties, taxes, brokerage, handling, and other inbound charges.

Cash & operationsRead definition

Lead qualification

Lead qualification is the evidence-based assessment of whether a prospective buyer has sufficient fit, need, authority, ability, timing, and genuine intent to justify the next sales action. It produces a stage decision using explicit criteria rather than merely ranking engagement.

Markets & customersRead definition

Lead scoring

Lead scoring is a rule-based or statistical method that assigns values to prospect characteristics and behaviors to rank likely fit, readiness, or conversion. A score prioritizes attention under a defined objective; it does not by itself verify need, authority, budget, or intent.

Markets & customersRead definition

Lead time

Lead time is the elapsed time from a defined starting event to a defined completion event, such as placing an order and receiving usable goods. Its meaning requires explicit boundaries, units, and calendar assumptions.

Cash & operationsRead definition

Leading indicator

A leading indicator is a proactive measure selected to provide early information about activity or conditions that may influence a later outcome. Its usefulness depends on an evidenced, monitored relationship to that outcome.

Planning & decisionsRead definition

Leading question

A leading question signals, assumes, or encourages a preferred answer through wording, framing, authority, imbalance, or conversational pressure. It can shift responses away from what participants would report under a more neutral prompt.

Markets & customersRead definition

Lessons learned

Lessons learned are evidence-based statements about what happened, why it happened, and what a future team should repeat, change, or avoid. A useful lesson names the context, consequence, causal reasoning, recommended action, owner, and where it will be reused.

Planning & decisionsRead definition

Life-cycle costing

Life-cycle costing (LCC), or whole-life cost analysis, is an economic evaluation method that sums all costs associated with an asset, product, or project from cradle to grave—spanning upfront R&D, design, acquisition, installation, energy and consumables, maintenance, downtime, and end-of-life decommissioning or disposal—typically discounted to net present value.

Cash & operationsRead definition

Likelihood ratio

A likelihood ratio compares how probable observed evidence is under one specified hypothesis or state versus another. Multiplying prior odds by the likelihood ratio yields posterior odds when the hypotheses and evidence model are correctly defined.

Planning & decisionsRead definition

Likert scale

A Likert scale measures an attitude or related construct through ordered response categories, commonly from strong disagreement to strong agreement, applied to one or more statements. Category wording, balance, direction, and the distinction between an individual item and a multi-item scale should be explicit.

Markets & customersRead definition

Line balancing

Line balancing assigns work elements across linked stations or people so each can meet the required production pace with limited waiting and overload. The design respects task sequence, skills, equipment, ergonomics, and the target cycle time.

Cash & operationsRead definition

Line extension

A line extension is the product-strategy move of introducing additional items or SKUs within the same product category under the same brand name—such as new flavors, pack sizes, form factors, formulas, or feature tiers—to reach additional category entry points or buyer segments.

Markets & customersRead definition

Little's Law

Little's Law states that the long-run average number of items in a stable flow system equals the average throughput rate multiplied by average time in the system: L = λW. The measures must share the same boundary, units, population, and sufficiently representative period.

Cash & operationsRead definition
One platform. Two tools.

Research the question.
Build the case.

Use Research Reports to understand the opportunity. Use Executive Editor to develop the recommendation, examine the assumptions and prepare a decision paper.

Research Reports

Explore markets, competitors, customers, brand perception or a product idea. Each one is a complete Standard report.

AI-assisted desk research · One-time report purchaseExplore Research Reports

Executive Editor

Write your case, connect evidence and calculations, review proposed changes and publish a saved version when you are ready.

Use your TDP account · No report purchase requiredExplore Executive Editor