Control Chart Limits Guide: How Two-Sigma and Three-Sigma Limits Trade False Alarms Against Detection Speed
How control limit width sets the false alarm rate and the time to detect a shift, and how to choose limits using costs.
The short answer
Three-sigma control limits give about 0.27% false alarms per point, one every 370 points on average, while two-sigma limits give about 4.55%, one every 22; narrower limits catch shifts faster but cost more in investigations, so choose limits by comparing those costs with the cost of running out of control.
Key takeaways
- Primary measure: False Alarm Rate and Average Run Length to Detect a Shift.
- Healthy: Limits chosen from the cost of false alarms and of undetected shifts, with response rules written down and reviewed.
- Watch closely: Standard three-sigma limits used everywhere without checking the cost trade-off.
- Act now: Limits drawn from specifications, or charts ignored because of too many alarms.
- Two-sigma limits detect a one-sigma shift in about 1.7 subgroups against 4.5, but at roughly 17 times the false-alarm cost; they pay only when shifts are frequent or very expensive, here about once every 14 days or more often.
How control limit width sets the false alarm rate and the time to detect a shift, and how to choose limits using costs. Key terms used below: control chart, Type I error, Type II error, process capability. Related guides: Process Capability Guide: Cp, Cpk, Centering, and the Cost of Defects and Acceptance Sampling Guide: Operating Characteristic Curves, Producer and Consumer Risk, and Inspection Cost.
What decision this guide supports
A control chart plots a statistic from the process over time with limits that mark how much variation is expected when nothing has changed. A point outside the limits is a signal that something may have shifted and is worth investigating.
Every limit width is a trade-off between two kinds of mistakes. Wide limits rarely raise false alarms but can be slow to see a real shift. Narrow limits spot shifts quickly but trigger many investigations that find nothing. These correspond to Type I and Type II errors in testing.
The usual three-sigma convention is a good default, but it was never meant to be optimal for every process. When investigations are cheap and undetected shifts are expensive, narrower limits can pay for themselves.
Key terms
- Control limit
- A boundary on a control chart set from the process's own variation.
- False alarm
- A signal when the process has not changed.
- Average run length
- The average number of points plotted until a signal occurs.
- Subgroup
- A small set of measurements taken together and summarized by one point.
How to calculate it
For a normally distributed statistic, the false alarm probability per point is the probability of falling outside the limits when the process is stable, which is about 0.0027 for three-sigma limits and 0.0455 for two-sigma limits. The average run length, or ARL, equals one divided by the probability of a signal per point. For a shift of k process standard deviations with subgroup size n, the shift in standard-error units is k times the square root of n, and the probability of a signal per point is the probability that the subgroup mean falls beyond a limit.
Benchmark matrix and working thresholds
The table summarizes the main options or components and what to watch in each.
| Limits | False Alarm Probability | ARL When Stable | Detection Probability for a 1-Sigma Shift (n = 5) | ARL After the Shift |
|---|---|---|---|---|
| Three-sigma | 0.27% | 370 | 22.2% | 4.5 points |
| Two-sigma | 4.55% | 22 | 59.3% | 1.7 points |
Working thresholds
Treat these as starting heuristics to calibrate against your own data, not universal standards.
- Healthy: Limits chosen from the cost of false alarms and of undetected shifts, with response rules written down and reviewed.
- Watch closely: Standard three-sigma limits used everywhere without checking the cost trade-off.
- Act now: Limits drawn from specifications, or charts ignored because of too many alarms.
Worked scenario
The figures below are an illustrative composite, not a named company or an audited case. Replace them with your own data.
Illustrative composite: a process is sampled eight times a day with subgroups of 5. A shift of one process standard deviation raises the standardized mean shift to 1 times the square root of 5, which is 2.236 standard errors. With three-sigma limits, a point is flagged if the mean exceeds 3 standard errors, which has probability about 0.222 once the process has shifted, so the ARL is about 4.5 subgroups. With two-sigma limits, the probability is about 0.593 and the ARL is about 1.7. The faster detection costs more false alarms. Per day, three-sigma limits yield 8 times 0.0027, or 0.022, false alarms, and two-sigma limits yield 8 times 0.0455, or 0.364. If each investigation costs 300 dollars, the daily false-alarm cost is about 6.5 dollars against 109 dollars. Assume running a shifted process costs 500 dollars per subgroup interval before detection. The 2.8 subgroups of detection time saved by two-sigma limits are worth about 1,400 dollars each time a shift occurs. The extra false-alarm cost is about 103 dollars per day, so two-sigma limits pay if shifts occur more often than about once every 14 days.
What the scenario shows
Two-sigma limits detect a one-sigma shift in about 1.7 subgroups against 4.5, but at roughly 17 times the false-alarm cost; they pay only when shifts are frequent or very expensive, here about once every 14 days or more often.
How to read the results
- If investigations are frequent and find nothing: Limits may be too narrow or the data not suited to the chart, so check the assumptions.
- If shifts are found late: Consider narrower limits, bigger subgroups, or charts built to catch small shifts.
- If the chart rarely signals but defects appear: The process may be stable but not capable, so compare it with specifications.
Common failure modes
- Applying three-sigma limits by habit: The default is not tuned to the costs of the process and may be too slow for expensive defects.
- Using specification limits as control limits: Specifications describe what customers accept, not what the process is currently doing.
- Ignoring non-normal or autocorrelated data: False alarm and detection rates computed from the normal curve can be far off for such data.
- Recomputing limits after every shift: Limits that chase the data stop detecting change.
Putting it into practice
- Estimate the costs: Measure the cost of an investigation and the cost per interval of running a shifted process.
- Choose limits and rules: Compute false alarm and detection rates for each option, and pick limits and any extra rules that minimize total cost.
- Write a response plan and review: Define what to check when a point signals, and review false alarms and missed shifts quarterly.
Sensitivity and limits
- Shift size: Test shifts of 0.5, 1, and 2 standard deviations, since small shifts are harder to catch.
- Subgroup size: Compare subgroups of 3, 5, and 10, which change the standardized shift.
- Cost ratio: Vary the cost of investigations and of running shifted, and see how the better limit changes.
These figures assume independent, normally distributed subgroup means and a fixed shift. Real processes drift, have unequal variation, and may need run rules or other charts that are better at small shifts.
Where this fits in a wider decision
Choose limits where the cost of defects and the cost of stopping to investigate are both known. Pair the chart with process capability studies and a written response plan, so that a signal leads to action.
Your checklist
- Confirm you have avoided this trap: Applying three-sigma limits by habit.
- Confirm you have avoided this trap: Using specification limits as control limits.
- Confirm you have avoided this trap: Ignoring non-normal or autocorrelated data.
- Confirm you have avoided this trap: Recomputing limits after every shift.
Steps to follow
Estimate the costs
Measure the cost of an investigation and the cost per interval of running a shifted process.
Choose limits and rules
Compute false alarm and detection rates for each option, and pick limits and any extra rules that minimize total cost.
Write a response plan and review
Define what to check when a point signals, and review false alarms and missed shifts quarterly.
Common questions
What is the false alarm rate of three-sigma limits?
About 0.27% per point for normally distributed data, which is roughly one false alarm every 370 points.
When should I use two-sigma limits?
When investigations are cheap and undetected shifts are expensive enough that faster detection outweighs more false alarms.
Related topics
- control chart limits
- two sigma vs three sigma limits
- average run length
- control chart false alarm rate
- statistical process control
- control chart sensitivity
- spc limits cost
Sources & further reading
- NIST/SEMATECH e-Handbook of Statistical Methods
National Institute of Standards and Technology
Statistical methods for control charts, process capability, and hypothesis tests.
- NIST Manufacturing Extension Partnership
National Institute of Standards and Technology
Public resources for manufacturers on quality improvement.
- ISO 31000 Risk management
International Organization for Standardization
General principles and process for managing risk.